BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 5, 2026 at 8:00 PM

Updated August 7, 2026

Site work and renovation of a road / highway in Kildeer, Illinois. Completed plans call for the renovation of a road / highway.

Installation of gabion baskets, guardrail replacement, site restoration and other associated improvements. Bonds: 10% Bid Bond, Certified Check required. Question Deadline 08/14/2026 at 10:00 AM CT Contact Gewalt Hamilton Associates, Attention: Village Engineer Geoffrey L. Perry, P.E. with any bid questions. No questions answered within seventy two (72) hours of bid opening. The Village is expected to award this contract at a special Board meeting, date to be determined. The Contractor shall begin the work to be performed under the contract not later than ten working days after the execution of the contract. The work shall be prosecuted in such a manner and with such a supply of materials, equipment and labor as is considered necessary to ensure its completion according to the time specified in the contract. The Contractor shall complete the work as described in Article 108.04 of the Standard Specifications. In case of failure to complete the work on time, the provisions of Article 108.09 of the Standard Specifications or other applicable BDE Special Provisions shall apply

GC Bidding

$900,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
592
Active Projects
271
Bidding Soon
4,646
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 17, 2026

September 16, 2026

Project location map

W Cuba Rd, Kildeer, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.