Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 2, 2026 at 8:00 PM

Updated October 8, 2026

Site work, paving and outdoor lighting for a road / highway in Bellwood, Pennsylvania. Completed plans call for outdoor lighting for a road / highway; for site work for a road / highway; and for paving for a road / highway.

As of September 30, 2026, this project has not yet been awarded. A timeline for award has not yet been established. The Green Light-Go Project will be located at the intersection of E. Pleasant Valley Blvd. (SR 1001) and Tipton Road (SR 4023). The project will include upgrades to the existing traffic signal that include but not limited to the following work: Traffic Signal Support with Mast Arms, Pedestrian Stub Poles, Traffic Signals, Pedestrian signals, Signage, Pavement Markings, Pedestrian Access Pads, Controller Assembly and Asphalt Paving. Bonds: 10% Bid Bond, Certified Check required, 100% Performance Bond, 100% Payment Bond. * Doc.Note - Digital Copies are available in PDF format at a 50% discount of the paper copies cost. All checks should be made payable to Stiffler, McGraw& Associates, Inc. Payment is non -refundable. A $ 10.00 ($5.00 for Digital) fee for postage and handling will be required for Contract Documents that are mailed to bidders. Question Deadline 09/16/2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. Completion- 420 calendar days

Award

$395,057.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
170
Active Projects
80
Bidding Soon
1,074
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2026

October 23, 2026

Project location map

E. Pleasant Valley Blvd. (SR 1001) and Tipton Road (SR 4023)., Bellwood, PA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed