BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 6, 2026 at 8:00 PM

Updated August 8, 2026

Site work and new construction of a mixed-use development in Buffalo, New York. Completed plans call for the construction of a museum; and library.

Construction of the Joyce Museum at Abbott Hall including structural, mechanical, electrical, and finish work components associated with the project scope. Bonds: 5% Bid Bond. If you do not have internet access or have questions on ordering from this site, please contact Avalon Document Services at (716)995-7777 SCOPE OF WORK A. The scope of work for asbestos abatement for this project is depicted on contract drawings HM-101 , HM -101M and HM -200. Refer to the contract documents for additional information regarding the asbestos abatement scope of work. The scope of asbestos abatement includes the following: Contractor shall remove and properly dispose of asbestos-containing floor tile (all layers) and associated mastic to facilitate flooring replacements. Properly remove all flooring materials down to and from substrate so that substrate is ready to accept new finishes. As floor tile was observed sticking to the back of the carpeting, where carpet is installed over asbestos-containing floor tile and mastic, the abatement contractor shall remove the carpet in conjunction with their abatement activities. On the Mezzanine M101 , where the shelving units are fastened into the flooring, the abatement contractor shall be responsible for removal of the cabinetry in conjunction with the abatement. Approximately 9,530 square feet of asbestos-containing floor tile and mastic. Contractor shall remove and properly dispose of asbestos-containing floor tile and associated mastic to facilitate east wall removal and door infill on north wall in Room 127A. Properly remove all flooring materials down to and from substrate. Contractor is responsible to keep/maintain the existing data rack online. Approximately 12 square feet of asbestos-containing floor tile and mastic.

GC Bidding

$7,500,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
603
Active Projects
246
Bidding Soon
4,822
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2026

February 11, 2027

Project location map

100 Diefendorf Loop, Buffalo, NY

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.