BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 19, 2026 at 8:00 PM

Updated August 25, 2026

Site work and new construction of a mixed-use development in Clermont, Florida. Completed plans call for the construction of a playground / park / athletic field; and water / sewer project.

Construction of a park and docking facility including all labor, supervision, materials, equipment, tools, transportation, permits, testing, and temporary facilities. Question Deadline 10/28/2026 at 3:00 PM ET Questions submitted by online *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The work generally consists of the redevelopment of the existing waterfront park and the construction of new fixed and floating marine facilities. Major improvements include concretepile-supported fixed piers and boardwalks, floating docks, finger piers, aluminum gangways, personal-watercraft docking systems, a wave attenuator, a pier gazebo, and associated railings, utilities, lighting, fire protection, and dock accessories. The project also includes demolition and removal of existing improvements; clearing, grading, drainage, erosion and sediment control ; sanitary sewer, lift station, force main, water, irrigation, and fire-service improvements; construction and modification of sidewalks and multi-use trails; and restoration of all disturbed areas. Landside park improvements include a public restroom facility, the Meet Us in the Middle plaza and gateway feature, decorative concrete and specialty paving, retaining and seat walls, tiered seating, memorial areas, artificial turf, landscaping , irrigation, site lighting, signage, benches, tables, bicycle racks, waste receptacles, bollards, and other site furnishings. The contractor shall coordinate all civil , marine, structural , architectural , landscape, mechanical, electrical , plumbing, and specialty work required to provide a complete and operational facility. The work shall also include maintenance of access and pedestrian detours, protection of existing improvements and utilities, environmental controls, inspections, testing, startup, cleanup, restoration, record drawings, warranties, and project closeout. All work must be completed in accordance with the Contract Documents, approved permits, applicable codes and regulation

GC Bidding

$9,000,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
428
Active Projects
175
Bidding Soon
2,843
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 5, 2026

January 1, 2027

Project location map

W Osceola St, Clermont, FL


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.