Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 11, 2026 at 8:00 PM

Updated September 17, 2026

Site work and new construction of a water / sewer project in Lagunitas, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Installation of an electronically actuated 24-inch plug valve, 36-inch, 24-inch and 8-inch welded steel pipe, manually operated butterfly valves, 8-inch gate valves, a remote control panel structure (RCP), and associated electrical components. Question Deadline 08/12/2026 at 5:00 PM PT Bidders who have questions regarding the project should contact Lucas Salem at 415-945-1547, lucas.salem@marinwater.org. Bonds: 10% Bid Bond, Certified Check required.

Bid Results

$722,465.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
446
Active Projects
153
Bidding Soon
2,983
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2026

September 1, 2026

Project location map

Sir Francis Drake Blvd & Lower Peters Dam Rd, Lagunitas, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed