Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 24, 2026 at 8:00 PM

Updated September 29, 2026

Site work and paving for a mixed-use development in Belton, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

The contractor shall furnish all tools, equipment, materials, labor, and supervision necessary to repair utilities and perform upgrades at Stillhouse Hollow Lake. The base work includes the installation of approximately 1,000 linear feet of electric line with service disconnects, one (1) breaker box and nine (9) 100-amp pedestals, approximately 2,000 linear feet of sewer line, a lift station, approximately 1,700 linear feet of waterline to accommodate nine (9) RV sites, approximately 10,000 square feet of concrete and approximately 2,000 square yards of asphalt paving. Optional work items include the construction of a new concrete road approach (IRRM Approach) with integrated culvert and headwall, installation of a 16-foot dual-swing gate system with an additional 1,600 square feet of reinforced concrete, and the installation of No Parking Towing Enforced signage and pavement markings across the project areas. Question Deadline 09/14/2026 All questions and/or comments are to be submitted via ProjNet Offerors are encouraged to submit all questions and requests for clarifications no less than seven (7) days prior to the RFP closing date. The decision whether to respond to questions and requests for clarification made less than seven (7) days prior to the RFP closing shall be at the sole discretion of the contracting officer.

Post-Bid

$300,000.00

Public - Federal

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
259
Active Projects
99
Bidding Soon
2,190
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 21, 2026

October 21, 2026

Project location map

3740 FM1670, Belton, TX

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed