Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 24, 2026 at 8:00 PM
Updated September 29, 2026
Site work and paving for a mixed-use development in Belton, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The contractor shall furnish all tools, equipment, materials, labor, and supervision necessary to repair utilities and perform upgrades at Stillhouse Hollow Lake. The base work includes the installation of approximately 1,000 linear feet of electric line with service disconnects, one (1) breaker box and nine (9) 100-amp pedestals, approximately 2,000 linear feet of sewer line, a lift station, approximately 1,700 linear feet of waterline to accommodate nine (9) RV sites, approximately 10,000 square feet of concrete and approximately 2,000 square yards of asphalt paving. Optional work items include the construction of a new concrete road approach (IRRM Approach) with integrated culvert and headwall, installation of a 16-foot dual-swing gate system with an additional 1,600 square feet of reinforced concrete, and the installation of No Parking Towing Enforced signage and pavement markings across the project areas. Question Deadline 09/14/2026 All questions and/or comments are to be submitted via ProjNet Offerors are encouraged to submit all questions and requests for clarifications no less than seven (7) days prior to the RFP closing date. The decision whether to respond to questions and requests for clarification made less than seven (7) days prior to the RFP closing shall be at the sole discretion of the contracting officer.
Post-Bid
$300,000.00
Public - Federal
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 21, 2026
October 21, 2026
3740 FM1670, Belton, TX
Related To This Project
Belton, TX
Bid Date: Oct 06 2026
Belton, TX
Bid Date: Aug 25 2026
Belton, TX
Bid Date: Sep 03 2026
Belton, TX
Bid Date: Sep 02 2026
Belton, TX
--
Belton, TX
--
Belton, TX
Bid Date: Sep 15 2026
Belton, TX
Bid Date: Aug 05 2026
Belton, TX
--
Belton, TX
--
Belton, TX
Bid Date: Jun 25 2026
Belton, TX
--
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed