Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 1, 2026 at 8:00 PM

Updated October 7, 2026

Site work and new construction of a multi-residential development in Orem, Utah. Working plans call for the construction of a 36,373-square-foot multi-residential development; and for site work for a multi-residential development.

“The owner has selected a Construction Manager. A timeline for construction has not yet been established.” RFP CM - Services for Campus Construction This Construction Management/General Contractor (CM/GC) project generally includes including a victim services building, emergency shelter building, transitional housing building, and associated site improvements. The current concept plans for the buildings to surround a secured interior courtyard supported by perimeter parking, circulation, landscaping, and related site infrastructure. Questions Due Date: Aug 12th 2026, 5:00 PM MDT Questions Online Portal Final Addenda Issued if Necessary August 17, 2026 The Refuge reserves the right to reject any or all proposals or to waive any formality or technicality in any proposal in the interest of The Refuge. The Refuge intends to construct a new multi building campus at 866 North 400 West, Orem, Utah to support domestic violence and sexual assault services, emergency shelter, and transitional housing. Based on the current concept documents, the project includes , and is planned to be phased as follows: • • • Phase 1 - Shelter Building totaling approximately 34,660 SF, or approximately 36,373 SF including storage, including intake, advocate offices, family and single resident units, kitchens, dining, laundry, med room, meeting/classroom areas, kids room, and related support spaces. Phase 2 - Victim Services Building totaling approximately 15,617 SF, including intake, children's space/daycare, domestic violence group class space, sexual assault victim room, private meeting rooms, therapy and office space, conference space, and support areas. Phase 3 - Transitional Housing Building totaling approximately 18,736 SF, currently shown as multi bedroom residential units intended to support temporary transitional housing. Associated site development, parking, landscaping, walks, security related site elements, and other related improvements as further refined through design and permitting.

Pre-Construction/Negotiated

$21,664,697.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
146
Active Projects
70
Bidding Soon
1,205
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2026

October 15, 2026

Project location map

866 N 400 W St, Orem, UT

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed