Published August 7, 2026 at 8:00 PM
Updated August 10, 2026
Site work and new construction of a playground / park / athletic field in Lee, Massachusetts. Completed plans call for the construction of a playground / park / athletic field.
Construction of a trail at the Town Farm Conservation Area that complies with the U.S. Forest Service Trail Accessibility Guidelines (FSTAG). Question Deadline 08/19/2026 at 4:00 PM ET Bidder questions to be submitted in writing to Christopher Brittain (christopher.brittain@leema.gov) Timely written responses to bid questions will be available online. Location The project is located on the Town Farm Conservation Area , 300 Stockbridge Road, Lee MA Background The Cornhill Farm Conservation Area comprises approximately 180 acres of recently acquired protected town land. A trail assessment recommended constructing a trail that complies with US Forest Service Trail Accessibility Guidelines ( FSTAG) beginning at the Stockbridge Road parking lot extending into existing fields (see photo) and feature rest areas, pullouts and vistas. Tasks include: 1) LOOP TRAIL Installing approximately 2,400 linear feet of new universally accessible crushed stone trail. Trail originates at existing gravel parking lot, and traverses open fields and two cleared tree lines (See sketch plan). Trail shall maintain a maximum running slope of 5% and shall maintain a 2% cross slope. Trail to maintain consistent 5-foot crushed stone width with additional minimum of 1/2 foot loam edging on both sides. One approximate 20' wide drainage swall may require leveling. One 20' by 5' crushed stone vista/ pullout shall be installed. Three 3' by 5' crushed stone resting places shall be installed adjoining the accessible loop trail (see sketch plans). 2) EXENSION Installing approximately 1800 linear feet of new universally accessible crushed stone trail. Extension links to loop trail and connects to Via Franco Road traversing open fields and one cleared tree line (see sketch plan). Trail shall maintain a maximum running slope of 8% and shall maintain a 2% cross slope. Trail to maintain consistent 5-foot crushed stone width with additional minimum of 1/2 foot loam edging on both sides. One approximate 20' wide drainage swall may require leveling. One 20' by 5' crushed stone vista/ pullout shall be installed. Four 3' by 5' crushed stone resting places shall be installed (one each segment) adjoining the trail. There will be 12' diameter level areas at the corner of each switchback and each section of trail between these level areas will have one or more grade dips or reversals to encourage stormwater drainage o the trail. The surface of the tread will be no more than an inch above the surrounding grade. Project Requirements The new trail is to be constructed by excavating to a width of 6-feet and depth of 12-inches. All areas to feature 8" aggregate stone base, approved filter fabric layer and a 4- inch compacted depth of 3/8' minus crusher fines top to applicable grade.
GC Bidding
$900,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 26, 2026
September 21, 2026
300 Stockbridge Rd, Lee, MA
Related To This Project
Lee, MA
Bid Date: Aug 19 2026
Lee, MA
Bid Date: Aug 07 2026
Lee, MA
Bid Date: Jul 13 2026
Lee, MA
Bid Date: Jul 14 2026
Lee, MA
Bid Date: Jun 30 2026
Lee, MA
Bid Date: Jun 30 2026
Lee, MA
Bid Date: May 07 2026
Lee, MA
Bid Date: May 07 2026
Lee, MA
Bid Date: May 27 2026
Lee, MA
Bid Date: Mar 24 2026
Lee, MA
Bid Date: Mar 03 2026
Lee, MA
Bid Date: Mar 03 2026
Lee, MA
Bid Date: Feb 03 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.