BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 7, 2026 at 8:00 PM

Updated August 10, 2026

Demolition and site work for an educational facility in Beaver, Utah. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.

Structural demolition and site backfill for the Old Beaver U Building. Question Deadline 08/18/2026 at 2:00 PM MT All questions and answers regarding the scope of services, must be submitted through the online Bonfire system. ; Online Portal. Contact Dallon Blackner: Maintenance (435) 421-1532 Russell Carter: Maintenance Department (435) 438-2291 or via email russell.carter@beaver.k12.ut.us Access to the location site for project completion must be arranged through the Dallon Blackner maintenance (435) 421-1532 or the project coordinator, Russell Carter Beaver County School District, hereafter referred to Facilities Director via email russell.carter@beaver.k12.ut.us or via phone (435) 438-2291. By using the information acquired from the site visit: The building is approximately 4,300 square feet with a partial basement. Include labor, materials, equipment and related services necessary to demolish and remove concrete basement slabs, foundation walls, footings, and exterior concrete within the site boundaries. Coordinate and verify the disconnect/capping of all utility lines prior to demolition. o Complete raze and removal of the above grade structure. Debris removal from the basement cavity prior to backfilling. o Supply, placement and compaction of clean structural fill in the basement cavity in 12" lifts to meet 95% standard proximity density. Final rough grading to match surrounding contours to prevent standing water, and grading to prevent water damage to nearby buildings. o There must be a protection fence around the area during the project You will need to work with the Beaver County School District IT prior to demolition , to reroute fiber with temporary poles to feed other areas of the campus. o Asbestos and lead testing have been completed by the district. The findings show that there will not need to be any abatement necessary for this project. Prevention of dirt under the track being compromised.

Sub-Bidding

$600,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
18
Bidding Soon
142
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2026

September 1, 2026

Project location map

102 N Main St, Beaver, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.