Published August 6, 2026 at 8:00 PM

Updated August 11, 2026

Site work and new construction of a municipal facility in Leonardtown, Maryland. Conceptual plans call for the construction of a municipal facility; and for site work for a municipal facility.

Construct the following facility infrastructure to support the Sheriff’s Office facility infrastructure requirements through 2040 as a result of the 2019 Sheriff’s Office Master Planning study: 1) 44,860 SF Headquarters Facility, 2) 15,000 SF Evidence Storage Building, 3) 40,000 SF Vehicle Evidence Storage Lot, 4) Secure personnel/patrol parking lot (235 car capacity), 5) Secure patrol/overflow vehicle parking (140 car capacity). The facilities will be designed as Risk Category Four per the St. Mary’s County adopted Building Code, 2015 IBC. The new facilities will occupy the 13.5 acre area in the northeast portion of the Governmental Center. Construction costs from study based upon FY2022 construction start and should be escalated 3% for future years. Construction cost of HQ facility (Phase 2) is in FY2026. Evidence Storage Facility and Site Improvements (Phase 1) top priority for FY2024. Phase 1 Design awarded on 10-19- 2021. For FY24: FY2024 and FY2026 project costs have been increased by 8% to reflect the Engineering News Record national average for co nstruction price increases for 2022. For FY25: HQ Building construction costs have been increased 6.5% for FY25 and an additional 2.31% for FY26.  PF-2509 New Project to track Headquarters Building construction separately from Evidence Storage facility and site development. Construction costs moved to FY28 The project is included in the County 2027-2031 Capital Improvement Program (CIP). As of August 6,2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

$25,285,000.00

Public - County

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
587
Active Projects
205
Bidding Soon
3,808
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2028

Project location map

23150 Leonard Hall Dr, Leonardtown, MD


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.