Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 6, 2026 at 8:00 PM
Updated August 11, 2026
Site work and new construction of a municipal facility in Leonardtown, Maryland. Conceptual plans call for the construction of a municipal facility; and for site work for a municipal facility.
Construct the following facility infrastructure to support the Sheriff’s Office facility infrastructure requirements through 2040 as a result of the 2019 Sheriff’s Office Master Planning study: 1) 44,860 SF Headquarters Facility, 2) 15,000 SF Evidence Storage Building, 3) 40,000 SF Vehicle Evidence Storage Lot, 4) Secure personnel/patrol parking lot (235 car capacity), 5) Secure patrol/overflow vehicle parking (140 car capacity). The facilities will be designed as Risk Category Four per the St. Mary’s County adopted Building Code, 2015 IBC. The new facilities will occupy the 13.5 acre area in the northeast portion of the Governmental Center. Construction costs from study based upon FY2022 construction start and should be escalated 3% for future years. Construction cost of HQ facility (Phase 2) is in FY2026. Evidence Storage Facility and Site Improvements (Phase 1) top priority for FY2024. Phase 1 Design awarded on 10-19- 2021. For FY24: FY2024 and FY2026 project costs have been increased by 8% to reflect the Engineering News Record national average for co nstruction price increases for 2022. For FY25: HQ Building construction costs have been increased 6.5% for FY25 and an additional 2.31% for FY26. PF-2509 New Project to track Headquarters Building construction separately from Evidence Storage facility and site development. Construction costs moved to FY28 The project is included in the County 2027-2031 Capital Improvement Program (CIP). As of August 6,2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
$25,285,000.00
Public - County
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2028
23150 Leonard Hall Dr, Leonardtown, MD
Related To This Project
Leonardtown, MD
--
Leonardtown, MD
--
Leonardtown, MD
Bid Date: Sep 04 2026
Leonardtown, MD
Bid Date: Aug 27 2026
Leonardtown, MD
Bid Date: Sep 11 2026
Leonardtown, MD
Bid Date: Sep 29 2026
Leonardtown, MD
--
Leonardtown, MD
Bid Date: Jul 02 2026
Leonardtown, MD
Bid Date: Jun 30 2026
Leonardtown, MD
Bid Date: Jun 11 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
