BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 21, 2026 at 8:00 PM

Updated August 26, 2026

Site work and paving for a road / highway in Statham, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Road paving and related improvements on Broad Street. Bonds: 100% Performance Bond. For this project, the advance warning signs specified in Subsection 150.3.04 shall be portable signs. These signs shall be placed only during times when construction is in progress or as conditions warrant as directed by county or (representative). Signs shall be removed at all other times. Costs for all Traffic Control shall be included in the LUMP SUM TRAFFIC CONTROL price. Any exceptions will be at the discretion of the county or (representative). Contractor and/or Subcontractor shall be responsible for all layouts. The costs for layout shall be included in the overall bid price. Prior to commencement of work, Contractor shall provide to City of Statham or (Representative) for acceptance of job mix formula. All required testing shall be done by the Contractor and/or Subcontractor. This testing shall be performed by an independent laboratory. Test samples shall be obtained from the distributor tank, nurse tank, holding tank, and/or delivery tank as directed by the county or (representative). Samples may be required from all on site tanks. Final payment will not be made until all tests results have been provided to the City or (Representative). The costs of all testing shall be included in the overall bid price. Any Loop Detectors that are damaged due to pavement preservation operations shall be replaced as per GDOT detail at locations designated by the Engineer, utilizing materials that are listed on the GDOT Qualified Products List (QPL). Testing of the loops shall be required. All necessary documentation regarding the loop detectors shall accompany the invoice before payment will be made. All costs associated with this work shall be included in the overall bid price. Prior to placement of any surfaces, existing shoulders shall be bladed no lower in elevation than the existing pavement or shoulder. All costs associated with this work shall be included in the overall bid price. All existing RPMs shall be removed prior to any surface operations. All costs associated with this work shall be included in the Lump sum traffic control price. The existing centerline and edge line pavement markings shall be replaced per 652 spec pavement markings for the full length of Resurfacing / Pavement preservation operations. Temporary centerline and edge lines shall be replaced according to Special Provision Section 150. Final centerline and edge lines shall be according to the Standard Specification Section 652. RPM's (Including any Type 10's) shall be replaced for the full length of pavement preservation operations. TWO RPMS will be placed on centerline at 80-foot intervals on all final surfaces. Thermoplastic pavement markings damaged by pavement preservation operations shall be replaced in kind. Thermoplastic shall be replaced according to Standard Specification Section 653. Thermo includes stop bars, arrows/words, crosswalks, hatching, R/R symbols, etc. The contractor is responsible for visiting project site to determine the amount/type of pavement markings needed. All costs for pavement markings and RPM's (all types) shall be paid for by striping pay item .

Award

$1,100,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
382
Active Projects
136
Bidding Soon
2,105
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2026

October 5, 2026

Project location map

Broad St, Statham, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.