Published August 21, 2026 at 8:00 PM
Updated August 26, 2026
Site work and paving for a road / highway in Statham, Georgia. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Road paving and related improvements on Broad Street. Bonds: 100% Performance Bond. For this project, the advance warning signs specified in Subsection 150.3.04 shall be portable signs. These signs shall be placed only during times when construction is in progress or as conditions warrant as directed by county or (representative). Signs shall be removed at all other times. Costs for all Traffic Control shall be included in the LUMP SUM TRAFFIC CONTROL price. Any exceptions will be at the discretion of the county or (representative). Contractor and/or Subcontractor shall be responsible for all layouts. The costs for layout shall be included in the overall bid price. Prior to commencement of work, Contractor shall provide to City of Statham or (Representative) for acceptance of job mix formula. All required testing shall be done by the Contractor and/or Subcontractor. This testing shall be performed by an independent laboratory. Test samples shall be obtained from the distributor tank, nurse tank, holding tank, and/or delivery tank as directed by the county or (representative). Samples may be required from all on site tanks. Final payment will not be made until all tests results have been provided to the City or (Representative). The costs of all testing shall be included in the overall bid price. Any Loop Detectors that are damaged due to pavement preservation operations shall be replaced as per GDOT detail at locations designated by the Engineer, utilizing materials that are listed on the GDOT Qualified Products List (QPL). Testing of the loops shall be required. All necessary documentation regarding the loop detectors shall accompany the invoice before payment will be made. All costs associated with this work shall be included in the overall bid price. Prior to placement of any surfaces, existing shoulders shall be bladed no lower in elevation than the existing pavement or shoulder. All costs associated with this work shall be included in the overall bid price. All existing RPMs shall be removed prior to any surface operations. All costs associated with this work shall be included in the Lump sum traffic control price. The existing centerline and edge line pavement markings shall be replaced per 652 spec pavement markings for the full length of Resurfacing / Pavement preservation operations. Temporary centerline and edge lines shall be replaced according to Special Provision Section 150. Final centerline and edge lines shall be according to the Standard Specification Section 652. RPM's (Including any Type 10's) shall be replaced for the full length of pavement preservation operations. TWO RPMS will be placed on centerline at 80-foot intervals on all final surfaces. Thermoplastic pavement markings damaged by pavement preservation operations shall be replaced in kind. Thermoplastic shall be replaced according to Standard Specification Section 653. Thermo includes stop bars, arrows/words, crosswalks, hatching, R/R symbols, etc. The contractor is responsible for visiting project site to determine the amount/type of pavement markings needed. All costs for pavement markings and RPM's (all types) shall be paid for by striping pay item .
Award
$1,100,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 14, 2026
October 5, 2026
Broad St, Statham, GA
Related To This Project
Statham, GA
Bid Date: Jul 29 2026
Statham, GA
Bid Date: Apr 24 2026
Statham, GA
Bid Date: Apr 02 2026
Statham, GA
Bid Date: Jul 18 2025
Statham, GA
Bid Date: Jan 17 2025
Statham, GA
Bid Date: Aug 29 2024
Statham, GA
Bid Date: Sep 03 2024
Statham, GA
Bid Date: Jul 11 2024
Statham, GA
Bid Date: Jul 11 2024
Statham, GA
--
Statham, GA
Bid Date: Mar 22 2024
Statham, GA
Bid Date: Mar 01 2024
Statham, GA
Bid Date: Sep 09 2022
Statham, GA
Bid Date: Nov 11 2021
Statham, GA
Bid Date: Jan 27 2022
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.