BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 7, 2026 at 8:00 PM

Updated August 9, 2026

Site work for a water / sewer project in Waller, Texas. Completed plans call for site work for a water / sewer project.

The project includes approximately 1,248 L.F. of 12-inch waterline and approximately 2,773 L.F. of 12-inch sanitary sewer for Blinn College Utility Extension project in the City of Waller, Texas, including sanitary sewer manholes, fire hydrant assemblies, trenchless utility crossings, and associated site restoration. Waterline and sanitary construction will be open cut and trenchless method with and without casing and restrained joint. Proposals must be accompanied by a certified or cashier's check or a bid bond from a surety company holding a permit in the State of Texas for an amount equal to 5% of the amount bid. The amount of said certified or cashier's check or bond will be forfeited to the OWNER and the bank or surety shall be liable to the OWNER for the amount in the event the successful bidder shall fail or refuse to enter into a contract or furnish bonds as hereafter required within ten (10) days after the date of notice of award. The successful bidder must furnish a performance bond and a payment bond on the forms provided, each in the amount of 100% of the Contract price from a surety company licensed by the State of Texas.

GC Bidding

$1,400,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
478
Active Projects
228
Bidding Soon
3,926
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2026

October 26, 2026

Project location map

29638 Farm to Market 2920, Waller, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.