Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 7, 2026 at 8:00 PM
Updated August 9, 2026
Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.
Replacement of exterior doors at Graham ES. Questions Due Date Online Portal Deadline to submit Questions Jul 27th 2026, 5:00 PM CDT Online Portal Demo and install (4) new exterior hollow metal, fire rated doors, frames and the surrounding concrete associated with each door along with all locking mechanisms, including the combinate keying system. 1) Demo and remove all 12 exterior doors, door panels and frames. 2) Provide and install (12) new hollow metal, fire-rated doors and corresponding framing and panels. 3) Provide and install (12) new mortise-type locksets and corresponding ADA required hardware. 4) Provide, install Details and adjust new automatic door closers for each door 5) Provide and install hold-opens for each door for each location of the installation 6) Provide and install new kick plates for each door installed. 7) Provide and install new crash bars or panic bars on exterior doors. 8) Replace and install new stationary panels or fixed panel doors to existing doors for the corresponding locations and door sweeps on all new doors. 9) paint all unfinished surfaces per discretion of the building administration, provide a color chart to building administration within 1 week of successful notice of award. 10) Provide, install and key new cylinders per specification of building administration. Keying system to be agreed upon by building administration. May include key mastering, section mastering, housekeeping mastering,etc. 11) Furnish (2) keys per cylinder and (20) keys for building attic stock 12) At door 3 dismantle the existing fob system and reinstall the same fob system on the new door. 13) Provide (2) copies of the keying specifications upon project completion. 14) Demonstrate the functionality of all of the installed items and best practices upon completion. 15) The successful bidder will schedule the work with building administration, starting no later than 30 days after the notice of the award unless otherwise instructed. 16) The successful bidder will keep the owner aware of all long lead items and minimize delays as much as possible. 17) Contractor to secure necessary permits. 18) Contractor to field verify dimensions and specifics of all projects listed above before placing bid. 19) Not responsible for contractor errors as a result of non-field verification. 20) Materials and installation must comply with CPS Standards and Specifications associated with the scope of this project. All questions/requests must be received two business days prior to bid closing.
Sub-Bidding
$500,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 13, 2026
September 14, 2026
4436 S Union Ave, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Aug 18 2026
Chicago, IL
Bid Date: Aug 13 2026
Chicago, IL
--
Chicago, IL
Bid Date: Aug 27 2026
Chicago, IL
Bid Date: Aug 18 2026
Chicago, IL
Bid Date: Aug 13 2026
Chicago, IL
--
Chicago, IL
Bid Date: Sep 17 2026
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Chicago, IL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
