BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 26, 2026 at 8:00 PM

Updated August 29, 2026

Renovation of a municipal facility in Erlanger, Kentucky. Completed plans call for the renovation of a municipal facility.

Involves providing all equipment , labor, and materials required for removing and replacing in kind six ( 6 ) rooftop units ( RTUS ) at NKWD's Central Facility . The method of Contractor Selection has not been Determined at this time. Question Deadline 08/21/2026 Questions received less than 72 hours prior to the date for opening of Bids may not be answered. All addendums will be issued through electronic bidding site. The person submitting questions shall be responsible for their prompt delivery SCOPE Project Overview: This scope of work outlines the requirements for the replacement of four (4) to seven-and-a-half ton (7.5 ton ) rooftop units (RTUs) and two (2) twelve-and-a-half ton (12.5 ton) rooftop units at Northern Kentucky Water District's Central Facility at 2835 Crescent Springs Pk Erlanger, Kentucky 41018. New VAV/VVT's will also be required for one of the units. The Contractor will provide all labor, materials, equipment, and services necessary to complete the project in accordance with the specifications set forth herein. 1. Project Goals: a. Replace existing RTUs with new model , like for like or approved equal energy-efficient models. See Paragraph 8 for additional details. b. Ensure compliance with all local codes and regulations. C. Minimize disruption to building occupants during replacement. 2. Replacement RTUs Specifications: a. Contractor to propose energy-efficient replacement units that meet or exceed current building codes. b. Units must include necessary controls for integration with existing HVAC systems. This includes new VAV/VVT's (Variable Air Volume) / (Variable Volume and Temperature) for Unit 11 . C. Provide options for enhanced air quality features (e.g., filters, UV lights). 3. Scope of Work: a. Removal and disposal of existing RTUs in accordance with environmental regulations. b. Supply, deliver, and install new RTUs. C. Connect new units to existing electrical and duct systems, ensuring compatibility andefficiency. d. Perform any necessary modifications to the structural supports on the roof. e. Conduct start-up procedures and verify system operations. f. Provide training for facility maintenance staff on operating new RTUs .

Post-Bid

$1,600,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
287
Active Projects
139
Bidding Soon
2,284
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2026

October 26, 2026

Project location map

2835 Crescent Ave, Erlanger, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.