Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 21, 2026 at 8:00 PM

Updated September 2, 2026

Site work for a stadium in Cincinnati, Ohio. Completed plans call for site work for a stadium.

The MBE utilization goal for this contract is 16.5 %, and the WBE utilization goal is 4.2 %. The SBE utilization goal for this contract is 20 %. Scope of work shall include, but not be limited to: receiving , unloading, handling , distribution and installation of all carpeting materials, carpet padding or matting materials and all resilient materials whether for use on walls, floors, counter, sink, table and all preparation work necessary in connection therewith, including sanding work. the installation of nonstructural under-layment and the work of removing , cleaning waxing of any of the above. Carpeting shall include any floor covering composed of either natural or synthetic fibers that are made in breadths to be sewed, fastened or directly glued to floors or over cushioning sound-proofing materials. Resilient Floors shall consist of and include the laying of all special designs of wood, wood block, wood composition, cork, linoleum, asphalt, mastic, plastic, rubber tile, whether nailed or glued. This is a Prevailing Wage Project, the Budget is $650,000 Question Deadline 08/18/2026 at 12:00 PM ET All inquiries regarding this ITB are to be e-mailed or mailed to Gina Richmond 138 E. Court Street, Room 507 Cincinnati , Ohio 45202 Email Purchasing@hamiltoncountyohio.gov

Post-Bid

$1,459,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
290
Active Projects
104
Bidding Soon
2,400
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2026

August 28, 2026

Project location map

3 Paycor Stadium, Cincinnati, OH

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed