BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 26, 2026 at 8:00 PM

Updated August 29, 2026

Site work and renovation of a transportation facility in Corpus Christi, Texas. Completed plans call for the renovation of a transportation facility.

This solicitation will follow a one-step process, with selection based on best value using the specific criteria set for in the CSP document. This project is funded by TxDOT Maritime Infrastructure Program grant and will require compliance with grant requirements. Contract will be awarded to the best, responsible, responsive Bidder that provides the best value to PCCA. The scope of work generally consists of removing existing equipment and installing a new conveyor belt, transfer station, hoppers, magnets, supporting foundations and berms, and all required electrical and mechanical systems. It also includes construction of an E-House and all site work necessary for complete operation Question Deadline 09/02/2026 at 5:00 PM CT Question Submit Online. Demolition & Disposal - Conveyor CB- 1 (excl. foundations) CB- 1 foundations Transfer Station TS-1 Conveyor CB-2 hopper & skirts Basin Modifications - Subgrade Stabilization & Excavation Basin Fill (minimum required) Material Handling Berms- Existing Soil (Cut) Drainage Fill Geogrid NX850 Compacted Berm Material (Fill) Slope Erosion Control Stormwater - 24-in HP Storm Pipe MHE FOUNDATIONS & INSTALLATION - Foundations (supply & install) CB-1 , TS01 ,ER8 Block Building + Foundation Equipment Erection (install only) CB-1, TS01, Emergency Reclaim Hoppers, Install skirts on CB2 Water Systems Low press. water dist. piping - supply High press. water dist. piping - supply High press. water dist. piping - supply Low press. water dist. piping - install Sump water discharge piping - install High press. water dist. piping - install Non- stormwater discharges from the site during construction activities will likely be dewatering pumped flows filtered through haybales and kept on-site in existing sedimentation system ponds.

GC Bidding

$2,500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
22
Bidding Soon
393
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2026

November 9, 2026

Project location map

402 Harbor Dr, Corpus Christi, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.