Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 10, 2026 at 8:00 PM
Updated August 15, 2026
Site work and renovation of a bridge / tunnel in Whitesburg, Kentucky. Completed plans call for the renovation of a bridge / tunnel.
Culvert road repairs using best construction practices. 1. Remove existing culvert and replace with 20 LF of 24 IN Diameter HDPE Culvert. 2. Install 26.67 SY of Geotextile Fabric around culvert and rock bedding according to specifications. 3. Install 18.73 Tons of Crushed Limestone Backfill around culvert. 4. Install 1.39 Tons of DGA road base on top of culvert. 5. Clean and reshape 40 LF of ditch/shoulder at inlet end of culvert. 6. Install 16 SY of Geotextile Fabric at culvert inlet and outlet. (18'L x 8'W) (32 SY total) 7. Install 8 Tons of Class II Channel Lining to culvert inlet (16'L x 6'W x1.5'D) 8. Install 8.53 Tons of Class III Channel Lining to culvert outlet (16'L x 6'W x1.5'D) 9. Install 32.67 SY of Geotextile Fabric to road ditch (42'L x 7'W) 10. Install 17.78 Tons of class II Channel lining (40'L x 5'D x 1.5'W) Questions: email judgeadams@letchercounty.ky.gov and procurement@erassist.com
Post-Bid
$450,000.00
Public - County
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2026
September 11, 2026
Skipper Dr, Whitesburg, KY
Related To This Project
Whitesburg, KY
--
Whitesburg, KY
--
Whitesburg, KY
--
Whitesburg, KY
--
Whitesburg, KY
--
Whitesburg, KY
Bid Date: Jun 10 2026
Whitesburg, KY
--
Whitesburg, KY
Bid Date: May 21 2026
Whitesburg, KY
Bid Date: Jun 03 2026
Whitesburg, KY
Bid Date: May 13 2026
Whitesburg, KY
Bid Date: Jun 09 2026
Whitesburg, KY
Bid Date: May 14 2026
Whitesburg, KY
Bid Date: May 14 2026
Whitesburg, KY
Bid Date: Jun 02 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
