BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 27, 2026 at 8:00 PM

Updated September 2, 2026

Site work and new construction of a bridge / tunnel in Lincoln, Nebraska. Completed plans call for the construction of a bridge / tunnel.

Culvert replacement project at Camp Ashland. The Project consists of removing and reconstructing a single 48" diameter drainage structure located at the Camp Ashland Army National Guard training site. The drainage structure is a feature of the federal Clear Creek levee system on the right bank of the Platte River. The structure was originally installed to convey excess water from Turner Lake to the Platte River. The design of the new drainage structure is similar to the existing except that the pipe invert elevation is set approximately two feet higher than the existing structure. The new reinforced concrete culvert pipe will have a concrete flared end section, an outlet headwall with sluice gate, concrete bedding, and seepage filters. A ring levee will be constructed prior to excavation within the Clear Creek levee. Work will also include removing and replacing rip rap protection, BMPs, and site restoration. Question Deadline 08/19/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered

Post-Bid

$900,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
64
Bidding Soon
745
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2026

September 25, 2026

Project location map

3125 Portia Street, Lincoln, NE


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.