BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 17, 2026 at 8:00 PM

Updated September 23, 2026

Site work and new construction of a civil project in Moberly, Missouri. Completed plans call for the construction of a water / sewer project; and water / sewer project.

Installation of approximately 16,500 linear feet of 4-inch force main, three submersible wastewater pumping stations, three generators, and appurtenances. Locations- New moberly mobile home park pump station New heritage hills pump station New fox hollow mobile home park pump station Question Deadline 09/04/2026 All questions about the meaning or intent of the Bidding Documents are to be directed to ENGINEER at Jacobs Engineering Group Inc, 1001 Highlands Plaza Drive W, STE 400, Saint Louis, MO 63110 Attention: Mr. Tobin Lichti; telephone: (314) 335-4550; Email: Tobin.Lichti@jacobs.com. Questions received less than four days prior to the date for opening of Bids may not be answered. Completion- 360 calendar days Engineer's estimate is $3.4M 1. Item 1. Mobilization: A lump sum payment not to exceed three (3) percent of the total bid amount that will be made to the contractor with the first monthly progress payment as a reasonable amount to start project 2. Items 2 and 3 Force Main: Shall be paid for in accordance with the City of Moberly's Standard Specifications for Water Main Construction. Payment for this item includes, but is not limited to, clearing and site protection. 3. Items 4, 5 , and 6. Pump Stations: Payment for this item includes, but is not limited to, the pump station, grading, excavation, gravel surface, granular backfill, compaction, pump station foundation, vaults, electrical and controls, emergency generator, piping, valves, meters, gravity sewer pipe, fencing, and all improvements associated with each pump station. 4. Item 7. Asphaltic Concrete Pavement- Remove and Replace: Payment for this item includes, but is not limited to sawcutting, removal of existing pavement, granular backfill, compaction of backfill, asphaltic concrete, and all labor, materials, tools and equipment required to furnish and install the pavement complete and in place. 5. Item 8. Concrete Pavement-Removal and Replace: Payment for this item includes, but is not limited to sawcutting, removal of existing pavement, granular backfill , compaction of backfill, concrete pavement, and all labor, materials, tools and equipment required to furnish and install the pavement complete and in place. 6. Items 9 and 10. Gravel Drive-Remove and Replace: Payment for this item includes, but is not limited to removal of existing pavement, granular backfill, compaction of backfill, and all labor, materials, tools, and equipment required to furnish and install the pavement complete and in place. 7. Items 11 and 12. Combination Air Release Valves (CARV): Payment for this item includes, but is not limited to, the CARV, piping, granular material , concrete vault, excavation, odor control, and all improvements associated with each CARV. 8. Item 13. Service Connections: Payment for this item includes, but is not limited to excavation, bedding, valves, risers, pipe, stop box, wye, and all improvements associated with each Service Connection. 9. Item 14. Directional Drill : Shall be paid for in accordance with the City of Moberly's Standard Specifications for Water Main Construction.

Post-Bid

$3,400,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
94
Active Projects
41
Bidding Soon
610
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2026

November 9, 2026

Project location map

Multiple Locations, Moberly, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.