BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 25, 2026 at 8:00 PM

Updated August 29, 2026

Site work and new construction of a detention facility in Massillon, Ohio. Completed plans call for the construction of a detention facility.

Assembly and installation of basketball hoops according to manufacturer specifications; requires concrete cutting, excavation for footings, pouring concrete for J-bolt anchors, permitting, and debris removal.Scope of work Spalding Basketball Hoops that are provided by the Ohio Department of Youth Services Indian River, 1 Instruction manual provided. 2 Contractor will need to assemble and install basketball hoop to manufactures specification. 3 Concrete will need to be cut to dig 3ft deep x 2ft diameter hole and concrete poured to Install J-bolts to secure basketball hoop to. 4 Contactor is responsible to pull all permits and inspections for all work to be performed. 5 Contactor responsible to remove all trash and debris from work area daily. 6 Site location 2775 Indian River RD Massillon, Ohio,44646 7 Work-site walk through Monday August 17, 026, at 11:00am. 8 Contractor will be responsible to contact Ohio811 before work can begin to check for underground utilities.

Post-Bid

$15,000.00

Public - State/Provincial

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
334
Active Projects
178
Bidding Soon
2,505
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2026

October 6, 2026

Project location map

2775 Indian River RD, Massillon, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.