BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 11, 2026 at 8:00 PM

Updated August 17, 2026

Site work and new construction of a water / sewer project in Temple Terrace, Florida. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Installation of approximately 800 feet of 6-inch fusible PVC water main via HDD, including fittings, gate valves, fire hydrant assemblies, cut-in-tees, disinfection, testing, and relocation of twenty-four dual potable water services on private property. CDBG N 54th Street Water Main Improvement Project generally involves the installation of a new 6-inch water main on 54th and 55th Street, connecting from the 6- inch main on East Mission Hills Avenue to new 6-inch water mains for both 54th and 55th Street. The project includes the installation of approximately 800 feet HDD of 6- inch fusible PVC water main, fittings, gate valves , fire hydrant assembly, cut-in -tee, disinfection, sampling, testing, and other appurtenances for a complete and operable system. Additionally, twelve new far side dual potable water services and twelve near side dual water services to be relocated and installed on private property to connect the residential customers to the new water main located in the front of the lots in the public right-of-way

GC Bidding

$250,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
395
Active Projects
149
Bidding Soon
2,530
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2026

October 19, 2026

Project location map

Multiple Locations, Temple Terrace, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.