BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 14, 2026 at 8:00 PM

Updated August 26, 2026

Site work and renovation of a water / sewer project in Lake Arthur, Louisiana. Completed plans call for the renovation of a water / sewer project.

Electrical rehabilitation of wastewater pump stations, including all necessary labor, materials, equipment, and tools. Summary Project Description : This project will consist of the following general scope of work. This description is provided for convenience purposes only and shall not be considered all inclusive. It is the general contractor's responsibility to become fully famliar with the existing conditions, review all of the construction document drawings, specifications, and any additional information documents in their entirety and bring forth any and all questions regarding scope confusion, misinterpretations, and/or possible errors and omissions to the Architect and/or Engineer prior to bid submission and/or start of construction. B. 1. This project consists of New Lights and Poles at Baseball & Softball Fields. New Lights Only at Football Field.. he improvements include: a. Erosion and sediment control. b. Bypass pumping and piping. c. Excavation and demolition of existing precast below grade concrete structures and piping. d. Installation of prAll of the work of this Contract is located in rights-of-way servitudes, or on property owned by the Owner. WORK TO BE DONE A. The Contractor shall furnish all labor, materials, equipment, tools, services and incidentals to complete all work required by these Specifications and as shown on the Drawings, all as prepared by Morgan Goudeau and Associates, Inc. B. The Contractor shall perform the work complete, in place, and ready for continuous service, and shall include repairs, testing, permits, cleanup, replacements and restoration, including restoration of vegetative cover required as a result of damages caused during this construction . C. All materials, equipment, skills, tools and labor which are reasonably and properly inferable and necessary for the proper completion of the work in a substantial manner and in compliance with the requirements stated or implied by these Specifications or Drawings shall be furnished and installed by the Contractor without additional compensation, whether specifically indicated in the Contract Documents or not. D. The Contractor shall comply with all Federal , State, and local codes which are applicable to the proposed construction work. GENERAL DESCRIPTION OF WORK TO BE PERFORMED A. The work included in the Contract shall be described in the Construction Contract. B. All work shall be done as described in the Specifications and as shown on the Drawings, complete, tested and ready for operation.ecast below grade structures with Parshall flumes, grating, ladder, access hatch and other miscellaneous appurtenances. e. Installation of ultrasonic level sensors for measuring flow with cable and conduit. f. Application of a protective coating to the vault interior. Question Deadline 08/26/2026 Submittal of questions shall be made to the Engineer in writing either by written correspondence or email . The Engineer and contact information for this project is William H. Jarrell , III , Aucoin & Associates, Inc., 433 N. CC Duson Street, Eunice, LA 70535, Phone: 337-457-7366, Email : william@morgangoudeau.com Questions received less than seven days prior to the date for opening of Bids may not be answered. Bid Documents are available and may be seen and examined at the Clerk's Office, 102 Arthur Avenue, Lake Arthur, Louisiana 70549 or at the office of Morgan Goudeau & Associates, Inc., Consulting Engineers, Opelousas, Louisiana. Copies of Bid Documents may be obtained from the office of Morgan Goudeau & Associates, Inc., 1703 West Landry Street, Opelousas, Louisiana, upon deposit of one hundred ($ 100.00) dollars for each set of documents. Copies of Bid Documents can be provided in electronic format (PDF) at no cost. Deposits on the first set of documents furnished to bona fide PRIME BIDDERS, fully licensed by the Louisiana State Licensing Board of Contractors, will be fully refunded upon the return of the documents in good condition, no later than ten (10) days after receipt of bids. On other sets of documents furnished to said prime bidders, the payment of one hundred ($100.00) dollars shall constitute the cost of reproduction and handling and WILL NOT BE REFUNDED. Classification of Contractor's License - Subclassification Electrical

Sub-Bidding

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
38
Bidding Soon
446
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2026

October 2, 2026

Project location map

102 Arthur Avenue, Lake Arthur, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.