BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 20, 2026 at 8:00 PM

Updated August 29, 2026

Site work, paving and renovation of a transportation facility in Greenville, Kentucky. Completed plans call for the renovation of a transportation facility.

Asphalt pavement construction, shouldering, seeding, and pavement marking. Bonds: 5% Bid Bond, 100% Performance Bond, 100% Payment Bond. Question Deadline 08/21/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing Questions received less than 48 hours prior the opening of Bids may not be answered. 1. Ensure NOTAM is active and install safety devices, perform lockout/tagout of airfield lighting system. 2. Mill and pave asphalt test strip including crack repair, crack relief seal coat, and asphalt pavement. 3. Mill existing taxiway connector tie-ins. 4. Perform crack repair in tie-in section and place crack relief seal coat where shown. a. Note Work Area Method 1 and Work Area Method 2 on sheet GI-101. 5. Pave asphalt overlay. 6. Apply temporary markings. 7. Grade and hydroseed along pavement edges. 8. Remove safety devices, ensure NOTAM is canceled , reopen runway. 9. After minimum of 30 days, re-close runway (NOTAM and closure markers required) and apply final pavement markings. 10. Reopen runway.

Post-Bid

$1,100,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
145
Active Projects
79
Bidding Soon
1,257
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 25, 2026

October 26, 2026

Project location map

399 Airport Rd, Greenville, KY


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.