Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 12, 2026 at 8:00 PM
Updated August 16, 2026
Site work and paving for a playground / park / athletic field in Chillicothe, Missouri. Completed plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.
Tear out the existing asphalt path around the two (2) East Tennis Courts at Danner Park and replace it with approximately 3,500 sq . ft. of concrete sidewalk. See attached overhead map for exact path locations marked in blue. The work to be performed below shall include labor, equipment, and materials necessary to complete the proposed projects. All materials for construction will be supplied by the contractor and should be included as part of the bid proposal. The work shall include, but not be limited to, the following: 1. Tear out existing asphalt walking trail around the two (2) Tennis Courts as well as the connecting path between. 2. Remove and haul off asphalt to the south lot of the Street Department located at 30 S Mitchell Ave, Chillicothe MO. 3. Ensure a 4-inch expansion around the existing concrete of the Tennis Courts. 4. Cross slope away from the Tennis Courts. 5. New Concrete sidewalks shall have a minimum 2-inch subbase compacted, be reinforced with 1/2 in rebar tied at two (2) foot centers and poured at a depth of four (4) inches deep by five (5) feet wide. Broom finish and saw cut. 6. Areas where concrete slabs exist, saw cut and chip or tear out to existing joints so that a true line exists. 7. Sidewalk must meet ADA compliance requirements.
Sub-Bidding
$2,000,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 26, 2026
October 26, 2026
Danner Memorial Park, Chillicothe, MO
Related To This Project
Chillicothe, MO
Bid Date: Jul 20 2026
Chillicothe, MO
Bid Date: Jul 22 2026
Chillicothe, MO
Bid Date: Jul 20 2026
Chillicothe, MO
Bid Date: Jul 20 2026
Chillicothe, MO
Bid Date: Jun 15 2026
Chillicothe, MO
Bid Date: Jun 22 2026
Chillicothe, MO
Bid Date: Jun 25 2026
Chillicothe, MO
Bid Date: May 26 2026
Chillicothe, MO
Bid Date: Jun 11 2026
Chillicothe, MO
Bid Date: Apr 30 2026
Chillicothe, MO
--
Chillicothe, MO
Bid Date: May 28 2026
Chillicothe, MO
Bid Date: May 08 2026
Chillicothe, MO
Bid Date: Jun 18 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
