BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 21, 2026 at 8:00 PM

Updated August 27, 2026

Renovation of a military facility in New York, New York. Completed plans call for the renovation of a military facility.

Provide all labor, materials, equipment, and incidental services necessary to remove the existing Vinyl Composition Tile (VCT) flooring and install a new industrial-grade epoxy flooring system in the first-floor and third-floor sallyports of the West Building. Work shall be performed in accordance with the Statement of Work and include all required demolition, surface preparation, installation, and finishing activities necessary to provide a complete and operational flooring system. The project is being procured as a firm-fixed-price construction contract with an anticipated performance period of 210 calendar days from issuance of the Notice to Proceed. The estimated magnitude of construction is between $100,000 and $250,000. Contractors shall provide a summary of their technical approach for completing the work, attend the mandatory site visit, submit the required bid bond, and complete the specified portions of SF 1442. Evaluation will consider past performance, price, and delivery time, with award based on a best-value determination to a responsible contractor whose quotation conforms to the solicitation requirements. Location: Metropolitan Detention Center (MDC) Brooklyn, 80 29th Street, Brooklyn, NY 11232. The performance period for the project will be 210 calendar days from issuance of the notice to proceed. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Any questions relating to the solicitation after the closing of the prequotation conference/site visit shall be sent to Jonathan Cogtla, Contracting Officer, via email at Jcogtla@bop.gov no later than Monday, August 17th at 10am . The Contractor shall provide all labor, materials, equipment, and incidentals to: Remove existing VCT and adhesive Prepare concrete substrate Install a complete multi-layer epoxy flooring system Install new baseboard Perform cleanup and restoration Work shall meet institutional durability, slip-resistance, and low-odor requirements

Sub-Bidding

$250,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,182
Active Projects
449
Bidding Soon
7,996
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.