BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 12, 2026 at 8:00 PM

Updated August 17, 2026

Site work and renovation of an educational facility in Carlisle, Massachusetts. Completed plans call for the renovation of a educational facility; and for site work for a educational facility.

Replacement of the retaining wall at the Carlisle Public School. Questions can be directed to theTown Administrator. Questions must be submitted by 1pm on August 26, 2026 Requests for interpretation shall be sent by email to the Town Administrator (rmclane@carlislema.gov) The Contractor shall furnish all labor, materials, equipment, and services required to complete the project, including but not limited to the following: A. Removal and Disposal o Remove the existing failed retaining wall system. o Remove and legally dispose of all demolished wall materials and unsuitable materials. o Protect adjacent pavement, utilities, landscaping, and existing site features during demolition activities. o Provide all necessary excavation required for installation of the new retaining wall system. B. New Retaining Wall Installation The Contractor shall install a new engineered retaining wall system suitable for roadway support conditions, including: o Proper excavation and preparation of the wall foundation. o Installation of a compacted crushed stone leveling base. o Installation of a segmental concrete retaining wall system or approved equivalent. o Installation of required retaining wall components including blocks, caps, connectors, reinforcement, and accessories. o Installation of geogrid reinforcement where required by the engineered design. o Installation of drainage materials behind the wall, including: o Clean drainage stone. o Filter fabric. o Perforated drainage pipe or equivalent drainage system. o Proper backfilling and compaction in accordance with the engineered design and manufacturer's requirements. C. Site Restoration Upon completion of the retaining wall installation, the Contractor shall : - Restore disturbed pavement edges, roadway shoulders, grades, and adjacent areas. - Remove all excess materials and construction debris. o Leave the site in a clean, safe, and finished condition acceptable to Carlisle Public Schools

Sub-Bidding

$500,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
864
Active Projects
452
Bidding Soon
5,351
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 2, 2026

October 2, 2026

Project location map

83 Church St, Carlisle, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.