BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 13, 2026 at 8:00 PM

Updated August 21, 2026

Site work and paving for a road / highway in Lake Zurich, Illinois. Completed plans call for site work for a road / highway; and for paving for a road / highway.

HMA Patching in accordance with Sections 451 and 701 of Standard 451 and 701 of Standard Specifications for Road and Bridge, 2022. Project Location: Various locations throughout the village. See priority map in bid documents Exhibit D Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - HMA Patching Electronic mail (email) and/or facsimile transmitted bids will not be accepted. Should the bidder require additional information about this bid, please submit questions via email , (with delivery & read receipt), to: Mike.Cernock@LakeZurich.org Questions should be submitted no later than 3:00pm on Thursday, August 13, 2026 The Work consists of furnishing all labor, materials, equipment, and incidentals necessary for the removal, preparation, and patching of various locations within the Village. This work shall be performed in accordance with Section 442 of the IDOT Standard Specifications, except as modified herein. The work shall include full-depth saw cutting, removal, and disposal of the existing pavement; preparation of the base course; and replacement with new hot-mix asphalt pavement to the thickness specified. Materials shall be installed in lifts not exceeding four (4) inches and compacted to the satisfaction of the OWNER. The final lift shall consist of a minimum of two (2) inches of Hot-Mix Asphalt Surface Course. The area measured for payment shall be the actual area marked by the OWNER. Any additional area removed or damaged by the Contractor beyond the limits established by the OWNER shall not be measured for payment and shall be removed and replaced at the Contractor's expense. All material removed shall be replaced with new material by the end of the same working day in accordance with these specifications. All materials shall be approved by the State of Illinois, and certified inspection tickets shall be furnished to the OWNER.

Post-Bid

$4,000,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
630
Active Projects
270
Bidding Soon
4,582
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 18, 2026

October 19, 2026

Project location map

Multiple Locations, Lake Zurich, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.