Published August 28, 2026 at 8:00 PM
Updated September 3, 2026
Site work and new construction of a bridge / tunnel in Easley, South Carolina. Completed plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.
Construction of a double-barrel box culvert on Heritage Road. Any questions or inquiries concerning the fabrication of the box culvert, delivery location, and/or other project-specific items shall be submitted by email to the attention of: Jamie Reynolds, Director of Roads & Bridges 186-A County Farm Road Pickens, SC 29671 Email: jreynolds@pickenscountysc.gov Phone : (864) 898-5934 All other questions or inquiries concerning this bid shall be submitted by email to the attention of Ralph Guarino, Purchasing Director 222 McDaniel Avenue, B-4 Pickens, SC 29671 Email: ralphg@pickenscountysc.gov Phone: (864) 898-5854 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.$50,000 to $100,000 The culvert shall match the size and Hydraulic Opening indicated in the contract plans or specified by the County in the bid documents. The culvert shall be constructed according to Section 722 in the SCDOT 2025 Standard Specifications for Highway Construction. A. Design Details 1 . Estimated cover/fill on top of the culvert will be 1 ' -2" compacted red clay, 6" crusher run, 2" binder, and 2" surface asphalt for a total road section of 2'. 2. Provide recommended methods for the connection of culvert sections and wing walls. 3. The bottom of the wing wall footer and the bottom of the box must be at the same elevation. B. Joint Sections Refer to the SCDOT 2025 Standard Specifications for Highway Construction, section 722. C. Manufacturing/Testing 1. Manufacturing shall be in accordance with AASHTO or ASTM. Refer to the SCDOT 2025 Standard Specifications for Highway Construction, section 722. Before Pickens County accepts the culvert, test cylinders must have passed in accordance with the said section of the standard. 2. Provide four (4) lifting/handling points using DR System Dog Bone and Clutches to ensure compatibility with Pickens County Roads & Bridges equipment. 3. Separate headwalls will not be accepted. Culvert sections with headwalls shall be one piece. 4. Each section shall be clearly marked and labeled. 5. Precast wing walls shall be supplied. Cast-in-place wing walls will not be accepted. The wing walls shall include a monolithic footer or bearing slab. Two-piece wing walls will not be accepted. The size of the bearing pad shall be determined by the design engineer. 6. Wing walls shall be constructed so that the total height will match the height of the culvert plus headwall. The wing wall shall slope at a rate of 3 : 1 and be 10' in length. 7. The culvert itself is a double-barrel, and each barrel shall have 8'(H) x 7'(W) hydraulic openings. The opening should be above the stream level during normal conditions . Each barrel shall have at least 48 ft of combined culvert sections. To reduce the weight of the sections, the barrels shall be separate (see culvert layout on page 14 for reference). DELIVERY AND INSTALLATION A. Delivery of the culvert will be to 274 Heritage Road, Easley, SC 29640. All sections of the double-barrel culvert shall be delivered no later than 6 weeks after the vendor receives the purchase order. B. Delivery of the double-barrel box shall be completed by the vendor or the vendor's subcontract haulers. Pickens County will coordinate with the vendor, and a one-week notice is required before delivery. Both the barrels, headwalls, and wing walls shall be delivered within 24 hours once the delivery date is set. C. The manufacturer shall have a representative on site during the delivery and setting of the culvert, in addition to the delivery drivers. D. The manufacturer shall provide the joint mastic that goes over each butt joint and the backing mastic that goes between the wing wall and headwall. Flat joint mastic shall have 6" overlaps.
Post-Bid
$100,000.00
Public - County
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2026
September 28, 2026
Heritage Rd, Easley, SC
Related To This Project
Easley, SC
Bid Date: Aug 27 2026
Easley, SC
--
Easley, SC
--
Easley, SC
--
Easley, SC
Bid Date: Jun 11 2026
Easley, SC
--
Easley, SC
Bid Date: Apr 06 2026
Easley, SC
--
Easley, SC
Bid Date: Mar 31 2026
Easley, SC
--
Easley, SC
Bid Date: Mar 25 2026
Easley, SC
Bid Date: Feb 06 2026
Easley, SC
Bid Date: Dec 30 2025
Easley, SC
Bid Date: Nov 14 2025
Easley, SC
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.