Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 9, 2026 at 8:00 PM
Updated October 19, 2026
Site work for a playground / park / athletic field in Rutland, Vermont. Completed plans call for site work for a playground / park / athletic field.
Construction of a safe walking path for community use at Pine Hill Park. All questions related to this Request for Proposals shall be directed to Tyler Dahlin at (802) 774-1478 or tylerd@rutlandrec.com or Shelley Lutz at shelley.lutz@gmail.com. Other than for very routine questions, all questions will be answered in writing and distributed to all interested parties Build an accessible trail, approximately 4600' long, following part of Lower Giorgetti , an existing trail, looping along East Creek back to the existing parking lot and connecting to Rutland Creek Path, which is an accessible non-motorized 10-foot-wide, paved path with less than 5% grade. The contractor will install erosion control where it is needed. Excavate organic material and create subgrade prep. Use of 6 inches of 1.5" washed drainage stone for the base layer, compacted. Non-woven Geotextile fabric for stabilization and filtration of soil particles needs to be fully wrapped around the base layer of 1.5" drainage stone. *See example in appendix . o Mid-layer of 3/4 " minus trail base stone, compacted at a depth of 3"-4". The top layer of Trail tread will be 5' wide with 3/8th minus surface material sourced from Brown's Quarry in Castleton (green) at a depth of 3" - 4", compacted with roller, plate compactor, or equivalent. Cross slope-outslope of no more than 2-3%. Install fully accessible bench cuts, where needed to accentuate trail curves to lengthen the run and reduce grades . Bumps outs to provide passing spaces where needed (Following guidelines outlined in USFS Trail Accessibility Guidelines (FSTAG 2013)). o Types of machinery to be used: excavator, material hauler, mini-skid steer, compactor, roller. Machinery will be supplied by the contractor and thoroughly washed before work. Timber mats or swamp mats are required if machinery is in the wetland. Follow AMP's for wetland construction in VT. o Hand tools (McLeods, Hazel hoes, shovels, pulaskis) for finish work. Finish work to be raked out and plate compacted or rolled. The contractor will coordinate with the Rutland Recreation and Parks Department to install pre-built bridges/boardwalks along the trail within wetlands. Contractor to clean up any leftover construction material once the project is completed. Trail edges must be revegetated.
Bid Results
$217,645.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 6, 2026
March 22, 2027
Multiple Locations, Rutland, VT
Related To This Project
Rutland, VT
--
Rutland, VT
--
Rutland, VT
Bid Date: Oct 19 2026
Rutland, VT
Bid Date: Nov 13 2026
Rutland, VT
Bid Date: Oct 29 2026
Rutland, VT
Bid Date: Oct 28 2026
Rutland, VT
Bid Date: Aug 21 2026
Rutland, VT
Bid Date: Sep 01 2026
Rutland, VT
Bid Date: Aug 03 2026
Rutland, VT
Bid Date: Jul 14 2026
Rutland, VT
--
Rutland, VT
Bid Date: Jun 30 2026
Rutland, VT
Bid Date: Jun 30 2026
Rutland, VT
Bid Date: Jun 16 2026
Rutland, VT
Bid Date: Jun 12 2026
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed