BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 18, 2026 at 8:00 PM

Updated August 25, 2026

Renovation of a municipal facility in South Hamilton, Massachusetts. Completed plans call for the renovation of a municipal facility.

AC Replacement at COA. Replace outdoor 35k BTU condenser and replace two 18k indoor high wall evaporator units, dispose of all old equipment, misc. piping, electric needed to replace units, testing, and startup. Question Deadline 08/19/2026 Every request for such interpretation should be in writing addressed to Timothy J. Olson, DPW Director, Hamilton Department of Public Works, Hamilton Town Hall, 577 Bay Road, PO Box 429, Hamilton, MA 01936, or emailed to tolson@hamiltonma.gov Quotes for the supply and installation of one (1) new 36k BTU heat pump outdoor unit and two (2) 18k BTU indoor high wall evaporator units with associated equipment. The work is located at the Hamilton Council of Aging, 299 Bay Road, Hamilton, MA The Work consists of: 1. Isolate existing system 2. Disconnect existing system, electrical, wiring, etc. 3. Remove and dispose of the two (2) 18k BTU high wall evaporators 4. Remove and dispose of one ( 1) 36k BTU outdoor unit 5. Remove and dispose of all piping, where accessible and exposed. Abandon in place in the basement area. 6. Furnish and build one ( 1) new 12" raised outdoor unit condenser stand 7. Furnish and install one ( 1) new Mitsubishi, or approved equal, 36k BTU Heat Pump outdoor unit condenser and mount on new stand 8. Furnish and install two (2) new 18k BTU Indoor high wall evaporator units in same location as old units 9. Furnish and install all required refrigerant piping from outdoor unit to the indoor units. New piping path will run low outside behind flowers and run up exterior wall to connect to indoor units utilizing existing piping path. 10. Furnish and install new white fortress pipe covering to conceal new refrigerant piping and wiring 11. Furnish and install new electrical disconnect at outdoor unit and electrical power wiring for the new units higher MOCP electrical rating 12. Furnish and install new electrical interlock wiring between outdoor unit and indoor evaporators 13. Pressure test, evacuate, and charge new system with R454B refrigerant 14. Startup and testing Work is located at the Hamilton Council on Aging located at 299 Bay Road, Hamilton, MA 01982. Time is critical and ways to expedite the work would be preferred. The Town would like all work completed prior to end of September, if possible.

Sub-Bidding

$20,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
724
Active Projects
372
Bidding Soon
4,472
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2026

September 25, 2026

Project location map

299 Bay Rd, South Hamilton, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.