Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 29, 2026 at 8:00 PM

Updated October 4, 2026

Site work and renovation of a water / sewer project in Essex Junction, Vermont. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The contract generally includes the following work items at the Water Resource Recovery Facility located at 35 Cascade Street in the City of Essex Junction: Primary Clarifier #1 * All steel in immersion including walls, rake arms and any miscellaneous piping. This does not include the steel-effluent channels. * Concrete Floors in immersion including grout injection to stop water infiltration, resurfacing, and lining. ADD ALTERNATE A * Add all atmospheric steel on Primary Clarifier #1. See Specification Section (2.02.B.) Secondary Clarifier #1 * All steel in immersion including drum, rake arms and any miscellaneous piping. *Concrete Floors in immersion including grout injection to stop water infiltration, resurfacing, and lining. BID GUARANTY: Each bid shall be accompanied by an acceptable form of Bid Guaranty in an amount equal to at least five percent (5%) of the amount of the Bid, payable to the City of Essex Junction, as a guaranty that if the Bid is accepted, the Bidder will execute the Contract and file acceptable Performance, Labor, and Material Payment Bonds within ten (10) days after the award of the Contract. Acceptable form for a Bid Guaranty is either a bid bond or certified check. No bidder may withdraw their bid within 30 days after the actual date of the opening thereof. The owner reserves the right to waive any informalities and to reject any or all bids. Question Deadline 09/24/2026 If any person contemplating submitting a Proposal is in doubt as to the true meaning of any part of the Drawings, Specifications, or other Contract Documents, or finds discrepancies in or omissions from the Drawings or Specifications , a written request (via email) for an interpretation or correction thereof may be submitted to Chelsea Mandigo, Water Quality Superintendent, City of Essex Junction, at chelsea@essexjunction.org up to seven (7) calendar days prior to the Bid Date CONTRACT TIME: If awarded the Contract, the Contractor agrees to complete the work in its entirety, as indicated in the specifications, within 120 calendar days, commencing seven (7) days after the issuance of the Notice to Proceed. The anticipated contract start date for the project is May 31, 2027. All work will be in accordance with Specifications and other Contract Documents and information prepared by the City of Essex Junction.

GC Bidding

$1,690,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
399
Active Projects
180
Bidding Soon
2,437
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2026

May 31, 2027

Project location map

35 Cascade St, Essex Junction, VT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed