BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 14, 2026 at 8:00 PM

Updated August 20, 2026

Demolition, site work, renovation and addition to a water / sewer project in Millis, Massachusetts. Completed plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Millis Middle/High School building was originally built in 1960 as a Junior/Senior High School for grades 7 through 12. In 1966, there was a 24-classroom addition and an increase in the size of the cafeteria and locker rooms to accommodate an increase in the student population. The building is a two-story brick and mortar structure of 125,000 square feet. In 1999, the building was renovated , but no additions were constructed. The current school serves 645 students in grades 6-12. This project includes demolition of the southwestern wing of the existing school , renovation of the remaining existing school facility, including removal of existing interior partitions, and construction of an approximately 55,000-square-foot new building addition along the south and east sides of the existing structure and new maintenance shed . The addition will include new classrooms, a gymnasium , restrooms, and office space. A new elevator will be constructed within the addition, adjacent to the southern wall of the existing building. The existing gym will be repurposed into an alternate PE space and media center, and existing high school classrooms, locker rooms, will be renovated and reconfigured. The site work is limited to new site circulation, parking, drainage, utilities, outdoor classroom and landscaping. Construction will be carried out in multiple phases over a 28-month period on a constrained, occupied campus. The school will remain operational throughout construction , requiring careful planning, sequencing, and coordination to maintain safe access for students, staff, and visitors while minimizing disruptions to ongoing educational and administrative activities. The phased approach will allow the project to progress efficiently while ensuring the continued operation of the school and associated offices. This project will have Business Enterprise Participation goals per the MSBA protocol, provided by the Massachusetts Supplier Diversity Office, along with Workforce compliance goals. Pursuant to M.G.L. c . 30, 39S(a)(2) all employees to be employed on the Project must have successfully completed a course in construction safety and health approved by OSHA and of at least 10 hours in duration. All General Contractors on the Project will also be required to provide written certification of compliance with applicable workforce related laws, including, Executive Order 481 , Federal Department of Homeland Security Requirements, and laws relating to worker classification, workers' compensation, and applicable laws related to taxes and insurance. Question Deadline 08/19/2026 at 5:00 PM ET All questions regarding this RFQ should be submitted to The Vertex Companies, Questions should be submitted by email to Laureen Westman, opmprocurement@vertexeng.com. VBE/SDVOBE: 3.0% Only prequalified Trade Contractor firms will be permitted to submit bids for the category of work in which they were prequalified. Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000.

Sub-Bidding

$98,000,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
904
Active Projects
458
Bidding Soon
5,462
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 26, 2026

November 1, 2026

Project location map

245 Plain St, Millis, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.