BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 14, 2026 at 8:00 PM

Updated August 16, 2026

Site work and new construction of a water / sewer project in Decatur, Illinois. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The project will consist of stabilizing a washout which has formed due to storm water runoff. The contractor will remove and dispose of deleterious material and fill the void with suitable clay soil to 85% standard proctor. An owner procured pre-cast storm water catch basin will be installed on the southwest terminus of Taylor Avenue . Two (2) 14 PVC pipes will be installed from the concrete structure, across SDD's interceptor a minimum of 7, daylighted discharge to R4 constructed drainage path. Embed pipe in CA7 gravel fill and terminated at the southernmost edge of the SDD easement. Geotextile fabric shall be placed at the base of pipe terminations and covered in Rip Rap (R4). Compacted in-situ will be placed over the pipes and re-graded to form an overflow swale for the storm drain inlet. The existing fence will be restored and turf reseeded. Stabilization and compaction of the crevasse extending to the south edge of the SDD utility easement. Excavation and installation of an owner procured storm water catchment basin on the southwest terminus of Taylor Ave with two (2) 14" PVC conveyance pipes from the storm water structure to the south edge of the utility easement with geotextile fabric and rip rap cover at the base of the outfall. Restoration of the easement with the establishment of an overflow drainage swale above the newly installed pipe.

GC Bidding

$500,000.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
58
Bidding Soon
956
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2026

October 12, 2026

Project location map

1505 S Taylor Ave, Decatur, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.