BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 14, 2026 at 8:00 PM

Updated August 20, 2026

Site work for a bridge / tunnel in Gravel Switch, Kentucky. Completed plans call for site work for a bridge / tunnel.

Replacement of a box culvert on Logan Road. Bridges to meet Ky. D.O.T. Standards HS25 rating. Contractor to be pre-qualified with Ky. D.O.T. to do State Work. Show proof of Liability and Workers Comp. Ins. Work to be completed within 90 days of the start date. Removal of existing culvert, along with the removal of debris. Box culvert to be 50 feet long. Box culvert opening to be 8 feet wide. Box culvert opening to be 8 feet tall. Box culvert to have HS25 load rating. Box culvert must have 6" curbing on each side above roadway. All materials to meet Ky. D.O.T. Standards. Box culvert to be backfilled by the builder with material suitable for the roadway. County will provide and haul all material used for backfill. Contractor must get appropriate permits. Project Location: 1.89 miles North From the intersection of US68 and Logan Rd. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

GC Bidding

$750,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
105
Bidding Soon
1,492
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 20, 2026

September 21, 2026

Project location map

Logan Rd, Gravel Switch, KY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.