Published August 18, 2026 at 8:00 PM
Updated August 27, 2026
Site work and paving for a road / highway in Curtiss, Wisconsin. Completed plans call civil work for a road / highway.
Reconstruction of 200 feet of W Matthias Street, including LRIP project requirements. Bonds: Bid Bond required (unspecified amount). Eestimate value is $30,000 to $55,000. Scope of Project: o Prep Saw cut ends and remove and properly dispose of asphalt Remove and dispose of all material under road surface to a depth of at least 24 inches below the bottom of the proposed asphalt. The floor of this excavation shall have a slope of at least 2% from center towards sides. Contractor shall inform Village if unsuitable sub surface is identified . The Village may arrange for deeper excavation in this event in the form of a change order or other means. Install Geo Fabric overlapping all seams by at least 3 feet Install at least 21 inches of 1 1/4 " crushed blue rock Install at least 3" of 1/2 " crushed blue rock Grade and slope base to fully prepare for asphalt installation Plan for 2% or greater slope from street crown to street edge. o Ensure proper compaction of base is present O Ditching Install subgrade vents at the lowest point in the project. These vents shall be at least 3 feet wide and fully drain the water out of the base material into the ditches. See cross sections. Clean, restore and seed ditches along either side of the project and in all directions as needed to restore proper drainage to this section of street. Final product to completely shed water Final product to be smooth for mowing. Asphalt Installation O Install two layers for a total 3" or more of cold mix asphalt 22 ft wide by 200 ft long Final product to completely shed water with no puddling o Alternates The following alternates shall also be priced (either negative or positive numbers) in the proposal for consideration by the Village. Alternate #1 - If Village takes removed and busted asphalt material at Material Area (Contractor to bust it up into 12" square chunks or smaller) Alternate #2 - If Village takes removed asphalt material at Material Area (no busting)
Post-Bid
$55,000.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 21, 2026
September 21, 2026
West Matthias Street, Curtiss, WI
Related To This Project
Curtiss, WI
Bid Date: Apr 16 2026
Curtiss, WI
Bid Date: Apr 16 2026
Curtiss, WI
Bid Date: Apr 16 2026
Curtiss, WI
Bid Date: May 13 2026
Curtiss, WI
Bid Date: Feb 23 2026
Curtiss, WI
Bid Date: Sep 25 2025
Curtiss, WI
--
Curtiss, WI
Bid Date: Apr 08 2025
Curtiss, WI
Bid Date: Oct 10 2024
Curtiss, WI
Bid Date: Apr 09 2024
Curtiss, WI
Bid Date: Mar 20 2024
Brown Deer, WI
--
Waupun, WI
Bid Date: Aug 27 2026
Cato, WI
Bid Date: Aug 27 2026
Stoughton, WI
Bid Date: Sep 03 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.