BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 14, 2026 at 8:00 PM

Updated August 17, 2026

Renovation of an educational facility in Golden, Colorado. Completed plans call for the renovation of a educational facility.

Replacement of rooftop air handling units at the Student Center. The scope of this project is to replace HVAC Systems serving Ballrooms A, B , C , D and E as well as an adjacent large meeting room. Schedule will be winter of 2027 as option A and Spring of 2027 as option B working around the university schedule. Exact start date pending award of construction contract. The Student Center will remain an occupied building for most of the project, with planned outages for a phased unit replacement to maintain as much HVAC functionality as possible. The project consists of replacing rooftop units rtu-3 and rtu-4, which have reached the end of their useful service life. Rtu-3 shall be the BASE bid. Rtu-4 shall be included as a separate bid alternate and shall be priced separately. Work will include complete demolition and replacement of both units, with rtu -3 converted from steam heating to natural gas heating. Bonds: Bid Bond required (unspecified amount). Question Deadline 08/24/2026 at 7:00 PM MT Question submitted to Sheri Atencio-Church satenciochurch@mines.edu 303-273-3615 Project No. 2717.13, IHC26-002

Sub-Bidding

$1,000,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
293
Active Projects
143
Bidding Soon
1,880
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2026

September 2, 2026

Project location map

1600 Maple St, Golden, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.