Published October 14, 2026 at 8:00 PM

Updated October 18, 2026

Site work, paving and new construction of a road / highway in Missouri City, Texas. Completed plans call for the construction of a road / highway; for site work for a road / highway; and for paving for a road / highway.

Street reconstruction project for Robinson Road Segment 1. NON-MANDATORY Prospective Bidders have the option of attending a Non-Mandatory Pre-Bid Conference in-person or virtually. In-Person Attendance: City Hall Council Chambers (2nd Floor)City of Missouri City, Texas 1522 Texas Parkway Missouri City, Texas 77489 Virtual Attendance:Microsoft Teams meeting Join:https://teams.microsoft.com/meet/24263736338562p=scfxdKp905aTZ0WXUi Meeting ID: 242 637 363 385 62 Passcode: zt9iF6yf ________________________________________ Dial in by phone +1 469-810-0642,,424114333# United States, Ennis Find a local number Phone conference ID: 424 114 333# Work of the Contract is for the reconstruction of Robinson Rd. from El Dorado Blvd to Golden Hills Ln/Robinson Ln. The project consists of replacing the existing 2-lane concrete curb-and-gutter roadway with a new 2-lane concrete curb-and-gutter pavement 28-feet wide (back to back of curbs) with lime stabilized subgrade. Work will generally include the reconstruction of roadway pavement, driveways, concrete curbs, storm sewer inlets, junction boxes, storm sewer laterals, street signage, and pavement markings.. The Contract Work also includes , but is not limited to: removal and replacement of the existing concrete pavement, base material and applicable driveways where shown on plans; the removal, replacement, of storm sewer laterals, inlets, and connections to or adjustments to inlets and manhole structures; the protection of existing trees, and sod , pavement markings and permanent signs; the removal , preservation, relocation, and installation of sign posts and signs; the placement and removal of temporary traffic control, and storm water management devices. The project consists of approximately 5,670 square yards (SY) of 8-inch thick reinforced concrete pavement with 6-inch curbs, and 405 square yards (SY) of concrete driveways. The proposed storm sewer system laterals consist of 24-inch diameter reinforced concrete pipe primarily lateral connections to existing storm sewer trunk; and approximately 1 manhole and 15 accompanying inlets and junction boxes, including manhole adjustments and connections. Phase 1 & Phase 3 (Construct South Bound from El Dorado Blvd to Golden Hills Ln/Robinson Ln): Place advanced warning signs, temporary barriers, temporary signs, temporary work zone pavement markings, and barricades as shown in the plans or as directed by the engineer. Construct the South bound of the segment of Robinson Rd pavement including stabilized subgrade, curbs, driveways and sidewalks. Complete Phase 1 and Phase 3 pavement according to the steps of construction indicated in the plans. Phase 2 & Phase 4 (Construct North Bound from El Dorado Blvd to Golden Hills Ln/Robinson Ln ): Place advanced warning signs, temporary barriers, temporary signs, temporary work zone pavement markings, and barricades as shown in the plans or as directed by the engineer. Construct the North bound of the segment of Robinson Rd pavement including stabilized subgrade, curbs, driveways and sidewalks. Complete Phase 2 and Phase 4 pavement according to the steps of construction indicated in the plans. Complete all remaining minor hardscape and softscape work, including, but not limited to, sidewalk, pedestrian ramps and sodding. Remove all temporary traffic control devices. Place final pavement markings and place traffic into final positions. Remove all applicable SW3P devices. Question Deadline 08/28/2026 at 3:00 PM CT Deadline for the Submittal of Written Questions Email to Bids@MissouriCitytx.gov (Note: Questions must be submitted on your company letterhead, addressed to the City's Procurement Manager, dated, and reference "IFB 26-120". The "City" will not respond to comments, suggestions, or observations about this project.) Posting of Answers to Question- 3 P.M. CDT September 4. 2026

Award

$1,522,308.00

Public - City

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
345
Active Projects
168
Bidding Soon
3,852
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 22, 2026

November 17, 2026

Project location map

Robinson Rd, Missouri City, TX

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed