Published August 19, 2026 at 8:00 PM

Updated August 24, 2026

Site work and renovation of a municipal facility in Quakertown, Pennsylvania. Completed plans call for the renovation of a municipal facility.

Removal and installation of a replacement emergency standby generator system, including 400-amp generator, 3-phase, 120/208V, diesel fuel tank, and a new fully automatic transfer switch. Bonds: 10% Bid Bond, Certified Check required, 100% Payment Bond, 100% Performance Bond. 1. Disconnect, unwire, and remove the existing generator set from its current location within the fenced compound. The existing double-throw disconnect switch shall be removed. (Note: once removed from the fenced area, responsibility for the existing generator transfers to the Township.) 2. Verify the existing concrete pad size and condition prior to removal of the existing unit; increase or replace the pad as needed to properly support the new generator. 3. Furnish and install a new standby generator in the same location as the existing unit, with the following minimum specifications: 400-amp capacity with a 400-amp main breaker internal to the generator Voltage: 3-phase, 120/208V Fuel type: diesel, with a sub-base (belly tank) fuel storage tank of approximately 80- 100 gallons, UL-listed / approved for long-term diesel storage 4. Furnish and install a new fully automatic transfer switch, rated 400 amps, outdoor rated, installed in the location of the removed disconnect switch. 5. All wiring, conduit, overcurrent protection, and grounding shall conform to the National Electrical Code (NEC) and all applicable Township and Commonwealth of Pennsylvania requirements. 6. Furnish and install a remote emergency stop (E-stop) station at a location that is readily accessible yet protected from accidental activation; exact location to be coordinated with the Township. 7. Coordinate and schedule crane service for both the removal of the existing generator and the setting of the new generator, as the equipment location is behind a secured fence. The Township's expectation is that both lifts be performed on the same scheduled day to minimize site disruption and crane mobilization cost. 8. Obtain all required Township permits, coordinate third-party plan review, and coordinate all inspections necessary for final approval and close-out of the Work. 9. Provide startup, testing, and commissioning of the complete system, including load bank testing as required to demonstrate proper operation. 10. All Work under this Contract, including final inspection and system commissioning, shall be substantially completed no later than December 31 , 2026. Bidders shall submit a proposed project schedule demonstrating the Work can be completed within this timeframe.

Sub-Bidding

$450,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,057
Active Projects
436
Bidding Soon
7,269
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2026

September 28, 2026

Project location map

2100 Krammes Rd, Quakertown, PA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.