BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 3, 2026 at 8:00 PM

Updated September 9, 2026

Site work and new construction of a fire / police facility in Grand Island, Nebraska. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

The successful bidder shall execute the following project phases. Phase I: Site Preparation Perform all necessary site excavation, grading, clearing, and filling. Provide, lay down, and compact engineered material to create a structurally sound, compacted pad suitable for a 60 ' x 100 ' structural footprint. Phase II: Concrete Foundation & Flatwork Install 8" insulated trench foundation. Pour engineered concrete piers matching structural loads at every building column location. Pour an 8" thick interior slab on grade utilizing 1/2" rebar spaced at 24" on center (OC) each way. Install 15-mil vapor barrier under interior concrete slab. Construct two (2) separate structural stoops for exterior walk doors. Site Walkthrough 09/09/2026 at 9:00 AM CT Phase III: Building Materials & Erection Supply and completely erect a pre-engineered 60' x 100' steel building featuring 16' tall sidewalls. Engineering must meet or exceed all State of Nebraska and City of Grand Island local code provisions regarding structural snow and wind loads. Roof framing shall be clad with 26-guage Galvalume screw down structural panels or an approved equal. Question Deadline 08/27/2026 at 12:00 PM CT Request from interest bidders for additional information or interpretation of the information included in the specifications should be directed in writing to Jamie Brockway, Budget & Purchasing Manager at Purchasingmanager@grand-island.com. The City of Grand Island, Nebraska , is soliciting sealed bids from qualified and licensed general contractors to provide site preparation, concrete foundation installation and the complete erection of a new pre-engineered steel building for the Grand Island Fire Department. Site preparation, concrete foundation installation and the complete erection of a new pre-engineered steel building.

GC Bidding

$3,700,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
21
Bidding Soon
256
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 17, 2026

November 16, 2026

Project location map

100 1st St E, Grand Island, NE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.