BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 19, 2026 at 8:00 PM

Updated August 21, 2026

Site work and renovation of a detention facility in Owatonna, Minnesota. Completed plans call for the renovation of a detention facility.

Roof replacement for the detention center facility. Project Summary: Removal and replacement of existing roof system consisting of: 1. Existing Roof System Areas A, C, F and G : Ballasted EPDM membrane over 1" inch EPS insulation over, 1-1/2" EPS insulation over a final layer of 2" EPS insulation each loose laid over precast concrete plank. 2. Existing Roof System Areas B, D, and E : Ballasted EPDM membrane over 1 " EPS insulation over, 1-1 /2" inch EPS insulation over a final layer of 2" EPS insulation over 5/8" gypsum each loose laid over 1-1/2" metal decking. 3. New Roof System Areas A, C, F and G: Tear-off existing roof system down to deck level. Clean concrete plank surface to prime and install 1 -ply vapor barrier. Adhere 1/8"/ft tapered rigid insulation with isocyanurate insulation fillers and a top layer of 1/2" high density isocyanurate cover board in two-part foam adhesive. Fully adhered 90 mil reinforced EPDM membrane onto cover board. 4. New Roof System Areas B , D, and E: Tear-off existing roof system down to deck level. Mechanically attach 1/2" dens deck to steel deck. Install 1 - ply vapor barrier on to dens deck. Adhere 1/8/ft tapered rigid insulation with isocyanurate insulation fillers and a top layer of 1/2" high density isocyanurate cover board in two-part foam adhesive. Fully adhered 90 mil reinforced EPDM membrane onto cover board. Bid Alternate New Roof System Areas A, B, C, D , E, F and G : Tear off existing roof system down to deck level . At concrete planks, prime and mop with asphalt 2-ply felt vapor retarder. Mop in asphalt 1/8/ft tapered rigid insulation with isocyanurate insulation fillers and a 1 perlite cover board . Install a 4 - ply built up roof with gravel surfacing. At steel deck location, mechanically attach 1/2 " dens deck and mop 2-ply vapor barrier. Install remaining built up roof system as described above. 6. Provide new 24 ga . gi . color-coated metal counter flashings to match. 7. Install new 1/2 inch per foot crickets and saddles at all, units, etc. Perimeter details include but are not limited to: Parapets and walls. 9. Penetrations/details include but are not limited to roof drains, mechanical unit curbs, pipe supports, vent stacks, and heat stacks

GC Bidding

$1,500,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
219
Active Projects
101
Bidding Soon
1,575
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2026

November 9, 2026

Project location map

2500 Alexander Dr SW, Owatonna, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.