Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 11, 2026 at 8:00 PM

Updated September 17, 2026

Site work, paving and new construction of a mixed-use development in Carroll Valley, Pennsylvania. Completed plans call for the construction of a playground / park / athletic field; bridge / tunnel; and sidewalk / parking lot.

Construction of four trail components: 1,726 linear feet of walking trail, 3,754 linear feet of singletrack hiking trail, a gravel driveway and parking area with ADA parking, and two 30-foot fiberglass-reinforced polymer bridge crossings.

Post-Bid

$950,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
563
Active Projects
237
Bidding Soon
3,554
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2026

October 25, 2026

Project location map

Skylark Trail, Carroll Valley, PA


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed