BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 21, 2026 at 8:00 PM

Updated August 25, 2026

Site work and new construction of a civil project in Hartington, Nebraska. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

Installation of water transmission mains including river and road crossings, construction of elevated and ground water storage tanks, and two booster pump stations including site work, foundations, piping, electrical, and generators. Question Deadline 09/23/2026 Submit questions via email to the Project Manager, Questions received less than seven days prior to the date for opening of Bids may not be answered. The Project includes the following Work: Contract 1: Includes the installation of approximately 3 1/2 miles of 18-inch HDPE waterline, 2 1/4 miles of 16" HDPE waterline, 400 linear feet of 12" PVC waterline, a Missouri River crossing, stream crossings, road crossings, cleanouts, valves, a concrete vault, testing, connections, restoration, and pipeline appurtenances. Contract 2: Includes the design and construction of a legged style elevated water storage tank with alternate bids for a 200,000-gallon tank, 300,000-gallon tank, and a 400,000-gallon tank. The scope includes initial site preparation, including clearing, grading, and reinforced concrete foundation construction . The assembled tank will undergo welding and coating for corrosion prevention. Integration of access structures, plumbing systems, ventilation, lightning protection, electrical systems, and a mixing system. Post tank construction will include tank disinfection, site restoration, and seeding. Contract 3: Includes the design and construction of a one-million-gallon ground storage tank. The scope includes excavation, and reinforced concrete foundation construction. The assembled tank will undergo welding and coating for corrosion prevention. Integration of access structures, plumbing systems, ventilation, and a mixing system. Post tank construction will include tank disinfection, and site cleanup. Contract 4: Includes the construction of two built-in-place booster pump stations. The scope of work includes site preparation, clearing, and grading. The building will require reinforced concrete foundations, domestic plumbing, installation of mechanical equipment, installation of electrical equipment (including generators), process piping, pumps, and connections to existing waterlines.

GC Bidding

$6,500,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
26
Bidding Soon
464
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2026

November 30, 2026

Project location map

608 N Robinson Ave, Hartington, NE

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.