BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 10, 2026 at 8:00 PM

Updated September 14, 2026

Demolition, site work and new construction of a bridge / tunnel in Pinehouse Lake, Saskatchewan. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

INSTALLATION OF TWO 2 000 mm DIAMETER AND TWO 800 mm DIAMETER MINISTRY SUPPLIED ALUMINIZED TYPE 2 CORRUGATED STEEL PIPE CULVERTS by open excavation of the Roadway at two locations on Highway No. 914, north of Pinehouse, SK; for a TOTAL LENGTH OF 64 m. Estimated Quantities: Removal And Disposal Of Culverts: 104 m Install Culverts Group IV, Ministry Supply: 34 m Install Culverts Group II, Ministry Supply: 30 m Random Riprap Type II: 215 m3 Documents are available at www.sasktenders.ca

Post-Bid

$500,000.00

Public - State/Provincial

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
4
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 8, 2026

October 17, 2026

Project location map

SK-914, Pinehouse Lake, SK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.