BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 20, 2026 at 8:00 PM

Updated August 24, 2026

Site work and environmental remediation for a municipal facility in Kotzebue, Alaska. Completed plans call for environmental remediation for a municipal facility.

Any questions related to this requirement must be submitted to the email Jodi Zachary, Contracting Officer, jodi.zachary@bia.gov above no later than Thursday, August 13, 2026, 9:00 AM Pacific Time. Environmental remediation and site characterization services. The Contractor shall furnish all labor, materials, equipment, logistics and technical expertise to plan , execute and report on site characterization, monitoring, well rehabilitation/replacement, IC planning and remediation strategy development suitable for Kotzebue's remote Arctic conditions. Work will build on prior data and close identified data gaps, with an emphasis groundwater monitoring, contaminated soil delineation along the former pipeline and potential alternate release areas in the vicinity of MW11 and MW16. 4.0 APPLICABLE REGULATIONS & GUIDANCE Work shall be performed in accordance with, but not limited to: o ADEC 18 AAC 75 (Oil and Other Hazardous Substances Pollution Control) ADEC Field Sampling Guidance (current) EPA Low-Stress (Low-Flow) Purging and Sampling Procedures and DEC's "Well Guidance" RCRA (IDW characterization and disposal) All applicable federal, state, tribal , and local regulations BIA policies and tribal coordination requirements 5.0 REQUIREMENTS AND TASKS Task 1 Project Management & Planning Conduct a kickoff meeting within 2 weeks of contract award; provide minutes within 10 business days. Review prior reports and datasets. Prepare and submit for BIA/ADEC approval: Site Characterization & Groundwater Monitoring Work Plan (18 AAC 75.335 compliance) Sampling and Analysis Plan (SAP) with analytical suites (DRO, GRO, RRO; BTEX/VOC; PAH). Site-Specific HASP (cold-weather, permafrost, tidal surge operations). Logistics plan addressing remote mobilization/demobilization, seasonal access, equipment winterization and community coordination PERFORMANCE LOCATION Field activities will occur in Kotzebue, within Lots 3-5 and Tract 4A (former hospital/school pipeline corridor and current school complex area).

GC Bidding

$650,000.00

Public - Federal

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
1
Bidding Soon
3
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 24, 2026

September 1, 2026

Project location map

To Be Determined, Kotzebue, AK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.