BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 20, 2026 at 8:00 PM

Updated August 26, 2026

Site work and renovation of a detention facility in Lansing, Michigan. Completed plans call for the renovation of a detention facility.

Construction Manager Services At-Risk (CM-AR) for the Ingham County Youth Center. Bonds: 5% Bid Bond, 100% Performance Bond, 100% Payment Bond. Question Deadline 09/02/2026 at 3:00 PM Any explanation desired by a Proposer regarding the meaning or interpretation of this RFP and attachments must be requested only to the Ingham County Purchasing Department, at questions@ingham.org and jbuckmaster@ingham.org. In 2026, Ingham County approved funding for the construction of a new Youth Center. The County intends to replace the existing facility with a modern, purpose-built building that supports safe operations , effective programming, and long-term adaptability. The new Youth Center is planned as an approximately 40,000 gross square foot facility, with expansion potential to approximately 50,000 gross square feet, and will maintain a capacity of 24 youth. The programming and conceptual design phase are in progress and expected to be completed in parallel with the onboarding of the construction manager. Preliminary program and drawings are attached to this RFP for reference. The programmed space is expected to be approximately 40,000 square feet total upon completion of the conceptual design phase, for which there is an estimated $34 million for construction to be generally inclusive of, but not limited to, the building construction, site work and utilities / infrastructure. The owner will provide geotechnical services, abatement, commissioning, move management, and potentially other vendors who can provide design-assist services that will be coordinated by the construction manager. The County intends to engage the CM to provide preconstruction services during the schematic design and design development phases, and work with the design team to create bid packages as needed to provide efficient progress of construction as the design is completed. Construction is anticipated to start in the fall of 2027. The CM will provide a work plan and proposed schedule with the RFP response to demonstrate how best to complete the project in the most efficient and cost-effective manner.

GC Bidding

$330,000.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
354
Active Projects
155
Bidding Soon
2,256
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2026

December 1, 2026

Project location map

1601 W Holmes Rd, Lansing, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.