BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 20, 2026 at 8:00 PM

Updated August 22, 2026

Renovation of a mixed-use development in Worcester, Massachusetts. Completed plans call for the renovation of a educational facility.

The University of Massachusetts Chan Medical School (University), Commonwealth of Massachusetts, invites qualified and experienced General Contractor (GC) firms and Electrical and HVAC Subcontractors (SC) Contractor Qualification DCAMM Certificate Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. The Project scope includes the complete demolition and renovation of existing laboratory and office space. RFI Submission Deadline: 08/27/2026 at 5:00PM EDT Requests for Clarifications (RFIs) will be Submitted through Electronically. The project is located on the 7th Floor of the Basic Wing at UMass Chan Medical School in Worcester, Massachusetts. The Project scope includes the complete demolition and renovation of existing laboratory and office space and converting it into new BSL3 laboratory space. The construction to occur will be in an active school environment and it will be the General Contractor's responsibility to adhere to all UMass Medical School Protocols for work occurring adjacent to occupied spaces. Work will involve the removal of all existing interior finishes, partitions, ceilings, and associated mechanical , electrical , Low voltage, Fire Alarm, plumbing, and fire protection (MEP/FP/FA) systems within the defined project area down to a shell space condition. The renovated space will support a specialized BSL-3 laboratory program. The scope includes the installation of all new MEP/FP/ FA elements required to support BSL-3 operations. Major equipment and associated infrastructure will be located either above the ceiling or within the building's mechanical penthouse above. IT is to be noted that there will be required roof penetration work for supporting MEPFP/design. All new systems will be fully integrated with the existing building utilities, services, and critical systems. The project also includes the installation of specialized laboratory equipment and associated infrastructure necessary to meet programmatic and operational requirements.

GC Bidding

$9,328,758.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
963
Active Projects
476
Bidding Soon
5,750
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2026

November 24, 2026

Project location map

55 N Lake Ave, Worcester, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.