BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 8, 2026 at 8:00 PM

Updated September 12, 2026

Site work, remodeling and addition to a mixed-use development in Escondido, California. Completed plans call for the remodel of a 84,229-square-foot, two-story above grade municipal facility.

Prevailing wage project (Public): Subcontractors are required to be registered with DIR. This project is also subject to the Project Labor Agreement (PLA) . Scope of Work – Selective demolition in a recently constructed cold shell, unoccupied building completed in 2024. SITE IMPROVEMENTS: Security fencing, including electrified swing and sliding gates with Knox switch, Opticom, and looped egress system. Natural gas line from SDG&E main. Emergency generators. Utility Yard with Bollard protection. Metal Canopy for proposed Wash Bay Security Cameras. Flag Poles. Level 1: Interior Walls, Doors, Ceilings, Casework, Finishes, Structural, Mechanical, Electrical, Plumbing, Low Voltage for New Office, Restrooms, Showers, Locker Rooms, Warehouse, Vehicular Maintenance Shop, Vehicular Storage, and Maintenance Fabrication Shops. New Passenger Elevator, New Stairwells, Areas that will remain Shell Space. Installation of a Safety Training Structure, including a Ladder and Guardrails. Level 2: Expansion of the Existing Mezzanine to become Level 2. Interior Walls, Doors, Ceilings, Casework, Finishes, Mechanical, Electrical, Plumbing, Low Voltage for New Office and Restrooms. Roof: Mechanical, Electrical, and Plumbing Work. Roof Patching. Antena. Estimated contract value - $30,000,000 to $33,000,000 ALL subcontractors MUST provide their valid contractor license number and classification also be registered with the Department of Industrial Relations (DIR) at the time of the bid. All subcontractors are responsible to review all project documents, including, but not limited to the plans and specifications and amendments/addendum. Subcontractors will be required to sign a Barnhart-Reese Construction subcontract (AGC Standard Subcontract Agreement available on Bid Mail upon request). All bids over $100,000 will be required to provide a payment and performance bond. Reference Number 0000434185 In general , the work to be completed under this Contract consists of constructing tenant improvements within an existing 84,229 square foot building in a cold dark shell condition. The work includes but is not limited to site improvements including emergency generators, utility yard with bollard protection, metal canopy, safety training center, security cameras, fencing and security gates with power and low voltage, interior walls, doors, ceilings, casework, finishes , structural mechanical, electrical plumbing, low voltage for offices and shops, structural expansion of existing mezzanine to buildout second floor office area including restroom and control room, mechanical , and roof penetrations to accommodate electrical, mechanical, and radio communication installed on the roof. Construction Cost Estimate: $30,000,000 to $33,000,000 Question Deadline 09/21/2026 at 4:00 PM PT All questions relative to this project prior to the opening of bids shall be emailed to Melissa Retener, Supervising Management Analyst, at mretener@sdcwa.org, *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

GC Bidding

$33,000,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
655
Active Projects
270
Bidding Soon
3,816
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 29, 2026

November 30, 2026

Project location map

1960 Citracado Parkwy, Escondido, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.