BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 24, 2026 at 8:00 PM

Updated August 25, 2026

Site work and renovation of an educational facility in New York, New York. Completed plans call for the renovation of a two-story above grade educational facility.

The total construction budget of the Project is approximately $24,000,000.00. This project involves Phase 1 of a comprehensive escalator replacement program in the West and East buildings at the college's main campus. The original construction date of the two buildings is estimated to be around the 1950s60s. The intent of the work envisioned in Phase 1 is to prioritize the replacement of the most critical escalators to ensure safe, reliable, and code compliant vertical circulation for students, faculty and staff. This includes sixteen (16) escalator runs in the West building from the basement level to the 7th floor, and two (2) escalator runs from the street level to the second-floor level in the East building for a total of 18 escalators. Original escalators were installed at the time the buildings were built in the 1960s. The existing escalators were last renovated approximately 20 years ago and are outdated, frequently malfunctioning, and no longer meet current safety, accessibility, or energy efficiency standards. In the long run, this project will lay the groundwork for a campus-wide escalator modernization strategy through phased implementation. The Dormitory Authority of the State of New York ( DASNY ) is seeking proposals from Construction Manager's capable of providing preconstruction services during design, construction management, and construction implementation for City University of New York Hunter College Escalator Replacement project located at 695 Park Avenue, New York, NY 10065 ( the Project) using a Construction Manager-Build (CMBuild) project delivery method. Preconstruction services, construction management, and construction implementation for the replacement of eighteen escalators in the West and East buildings at Hunter College. Set-asides: 18% MBE, 12% WBE.

GC Bidding

$24,000,000.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,237
Active Projects
497
Bidding Soon
8,206
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2026

November 1, 2027

Project location map

695 Park Ave, New York, NY

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.