Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published August 24, 2026 at 8:00 PM
Updated August 25, 2026
Site work and renovation of an educational facility in New York, New York. Completed plans call for the renovation of a two-story above grade educational facility.
The total construction budget of the Project is approximately $24,000,000.00. This project involves Phase 1 of a comprehensive escalator replacement program in the West and East buildings at the college's main campus. The original construction date of the two buildings is estimated to be around the 1950s60s. The intent of the work envisioned in Phase 1 is to prioritize the replacement of the most critical escalators to ensure safe, reliable, and code compliant vertical circulation for students, faculty and staff. This includes sixteen (16) escalator runs in the West building from the basement level to the 7th floor, and two (2) escalator runs from the street level to the second-floor level in the East building for a total of 18 escalators. Original escalators were installed at the time the buildings were built in the 1960s. The existing escalators were last renovated approximately 20 years ago and are outdated, frequently malfunctioning, and no longer meet current safety, accessibility, or energy efficiency standards. In the long run, this project will lay the groundwork for a campus-wide escalator modernization strategy through phased implementation. The Dormitory Authority of the State of New York ( DASNY ) is seeking proposals from Construction Manager's capable of providing preconstruction services during design, construction management, and construction implementation for City University of New York Hunter College Escalator Replacement project located at 695 Park Avenue, New York, NY 10065 ( the Project) using a Construction Manager-Build (CMBuild) project delivery method. Preconstruction services, construction management, and construction implementation for the replacement of eighteen escalators in the West and East buildings at Hunter College. Set-asides: 18% MBE, 12% WBE.
GC Bidding
$24,000,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 11, 2026
November 1, 2027
695 Park Ave, New York, NY
Related To This Project
New York, NY
Bid Date: Aug 31 2026
New York, NY
Bid Date: Sep 03 2026
New York, NY
Bid Date: Sep 18 2026
New York, NY
--
New York, NY
--
New York, NY
--
New York, NY
Bid Date: Oct 14 2026
New York, NY
--
New York, NY
Bid Date: Sep 18 2026
New York, NY
Bid Date: Sep 21 2026
New York, NY
Bid Date: Aug 20 2026
New York, NY
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
